Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/ASTRO CAPITAL GROUP LLC
Back to prospects

ASTRO CAPITAL GROUP LLC

Brooklyn, BROOKLYN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 8 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness2 / 5Latest signal is within 270 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
ASTRO CAPITAL GROUP LLC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
May 13, 2026
Source for Signal date (opens in new tab)
Signal count
10 saved signals, 0 in the last 90 days
Signal summary
Plumbing · Plumbing work for tenant fit-out as shown in the plans attached.
Source for Signal summary (opens in new tab)
Address
106-07 NORTHERN BOULEVARD
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

10 signals
  • May 13, 2026
    Permit
    Plumbing · Plumbing work for tenant fit-out as shown in the plans attached.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 29, 2026
    Permit
    Sprinklers · Sprinkler work for tenant fit-out as shown in plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 28, 2026
    Permit
    Structural · -STRUCTURAL MODIFICATIONS REQUIRED TO INFILL FLOOR OPENINGS IN THE EXISTING 1ST FLOOR FRAMING.-STRUCTURAL MODIFICATIONS REQUIRED FOR MECHANICAL PENETRATIONS THROUGH EXISTING ROOFFRAMING.-STRUCTURAL MODIFICATIONS REQUIRED TO SUPPORT THE NEW RTU ON NEW DUNN
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 28, 2026
    Permit
    Mechanical Systems · Modifications to existing HVAC system and related piping including installation of rooftop units. Installation of commercial kitchen exhaust hood & ventilation system complete with UL-listed hood. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 28, 2026
    Permit
    General Construction · EXTERIOR:NEW STOREFRONT DOOR IN EXISTING OPENING. INSTALLATION OF AWNING AND EXTERIOR PAINT.INTERIOR:TENANT BUILD OUT FOR A NEW FINE/FAST-CASUAL RESTAURANT WITH DINE-IN AND TAKE-AWAY SERVICES INCLUDING DEMOLITION AND GENERAL CONSTRUCTION WORK OF INTERIOR
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 14, 2026
    Permit
    General Construction · Convert existing 4 family dwelling unit into a 1 family dwelling unit. Interior renovation as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 12, 2026
    Permit
    Plumbing · Plumbing work as per plans filed
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 9, 2026
    Permit
    General Construction · Convert existing 4 family dwelling unit into a 1 family dwelling unit. Interior renovation as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 5, 2026
    Permit
    Mechanical Systems · Mechanical work as per plans filed
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 18, 2025
    Permit
    Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEM FOR ENTIRE ONE FAMILY DWELLING IN CONJUCTION WITH ALT 1 APPLICATION B08025934 . NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)