Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip(120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.
Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip(120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.
No product keyword matched · NYC DOB electrical permits
This scope of work includes core-drilling one penetration through the concrete slab and metal decking into the 302 electric room to establish the raceway path, then installing a UL-listed firestop system to restore the assembly's fire rating. We'll run 3/4"" EMT raceway with supports, fittings, and boxes as needed from the 302M source to the door location, and install a new 120V, 20A branch circuit terminated on a 20A/1-pole breaker. A heavy-duty toggle switch will be installed at the door and co
No product keyword matched · NYC DOB electrical permits
Furnish/install: (1) 2-pole 120/208V disconnect switch; ~35' MC/BX cable from power source to equipment; (1) 4-11/16"" junction box w/ blank cover; sealtight whip w/ connectors from disconnect to equipment; MC/BX connectors, chase nipples, and nipples as needed. Core-drill (1) floor penetration (basement to 1st floor) for cable/raceway. Hammer-drill mounting/routing penetrations, max "" dia. Make final connections, test, and energize disconnect.
No product keyword matched · NYC DOB electrical permits
Coordinate electrical shutdown and replace existing 8-position panel with new 12-position Eaton panel in apartment 12G. Upgrade both bathrooms with new circuits, GFCI receptacles, recessed lighting, and Decora switches. Install dedicated circuits for refrigerator, stove, dishwasher, and countertop receptacles in kitchen. Update living room outlets.
No product keyword matched · NYC DOB electrical permits
Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip(120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.
No product keyword matched · NYC DOB electrical permits
Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip (120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.