Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/ArcPoint Electrical LLC
Back to prospects

ArcPoint Electrical LLC

Queens, Manhattan, Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
ArcPoint Electrical LLC
Source for Company (opens in new tab)
Signal source
NYC DOB electrical permits
Signal date
Oct 20, 2026
Source for Signal date (opens in new tab)
Signal count
9 saved signals, 5 in the last 90 days
Signal summary
Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip(120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.
Source for Signal summary (opens in new tab)
Address
500 7th Avenue, New York, NY 10018
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

9 signals
  • Oct 20, 2026
    Permit
    Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip(120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 28, 2026
    Permit
    Panel Upgrade and receptacle install
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 28, 2026
    Permit
    Panel upgrade and additional receptacles
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 21, 2026
    Permit
    This scope of work includes core-drilling one penetration through the concrete slab and metal decking into the 302 electric room to establish the raceway path, then installing a UL-listed firestop system to restore the assembly's fire rating. We'll run 3/4"" EMT raceway with supports, fittings, and boxes as needed from the 302M source to the door location, and install a new 120V, 20A branch circuit terminated on a 20A/1-pole breaker. A heavy-duty toggle switch will be installed at the door and co
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 17, 2026
    Permit
    Install 4 lights and 2 outlets
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 13, 2026
    Permit
    Furnish/install: (1) 2-pole 120/208V disconnect switch; ~35' MC/BX cable from power source to equipment; (1) 4-11/16"" junction box w/ blank cover; sealtight whip w/ connectors from disconnect to equipment; MC/BX connectors, chase nipples, and nipples as needed. Core-drill (1) floor penetration (basement to 1st floor) for cable/raceway. Hammer-drill mounting/routing penetrations, max "" dia. Make final connections, test, and energize disconnect.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 10, 2026
    Permit
    Coordinate electrical shutdown and replace existing 8-position panel with new 12-position Eaton panel in apartment 12G. Upgrade both bathrooms with new circuits, GFCI receptacles, recessed lighting, and Decora switches. Install dedicated circuits for refrigerator, stove, dishwasher, and countertop receptacles in kitchen. Update living room outlets.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jul 27, 2026
    Permit
    Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip(120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jul 24, 2026
    Permit
    Run 4 dedicated 120/208V, 20A circuits from AP-2W SEC 1&2, each feeding 3 toggle switches (12 total). Drill and firestop 4 code-compliant wall penetrations from electrical room to garage. Install and support EMT conduit to each switch group. At each of the 12 switches, leave a 4' whip (120/208V, 20A) coiled, capped, labeled, and safed-off for garage door contractor's final connection. All work per NEC.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)