Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/BLUE WINTER LLC
Back to prospects

BLUE WINTER LLC

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 10 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
BLUE WINTER LLC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Sep 28, 2026
Source for Signal date (opens in new tab)
Signal count
15 saved signals, 4 in the last 90 days
Signal summary
Support of Excavation · Filing subsequent SOE application. Initial filing is ALT CO for conversion of 5 story building to single family dwelling.
Source for Signal summary (opens in new tab)
Address
242 WEST 30TH ST, SUITE 900
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

15 signals
  • Sep 28, 2026
    Permit
    Support of Excavation · Filing subsequent SOE application. Initial filing is ALT CO for conversion of 5 story building to single family dwelling.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 28, 2026
    Permit
    Structural · Renovation of an existing 5 story residence. Work to include new framing being installed at the stair and elevator core. The existing light well is being filled in the 2nd and 3rd floors. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 28, 2026
    Permit
    Foundation · Application being filed for the layout and installation of underpinning and performing general excavation as needed to achieve final foundation subgrades for the proposed development.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 28, 2026
    Permit
    Foundation · Filing subsequent foundation application at subcellar.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 9, 2026
    Permit
    Mechanical Systems · Mechanical work as per drawings filed herewith. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 26, 2026
    Permit
    General Construction · CONVERSION OF EXISTING 5- STORY PLUS CELLAR MASONRY EIGHT FAMILY DWELLING TO 5-STORY PLUS CELLAR SINGLE FAMILY DWELLING. NEW CERTIFICATE OF OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 16, 2026
    Permit
    Suspended Scaffold · Installation of suspended scaffold for facade repair.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 1, 2026
    Permit
    Sprinklers · Application being filed for the installation, relocation, and replacement of Sprinkler fixtures as per plans filed herewith. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 30, 2026
    Permit
    Construction Fence · Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 27, 2026
    Permit
    Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 8, 2026
    Permit
    Supported Scaffold · Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 19, 2026
    Permit
    Plumbing · Relocation and installation of new Plumbing and Gas fixtures and associated piping as per plans filed herewith. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 16, 2026
    Permit
    Structural · Renovation of an existing 5 story residence. Work to include new framing being installed at the stair and elevator core. The existing light well is being filled in the 2nd and 3rd floors. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 7, 2026
    Permit
    Mechanical Systems · Mechanical work as per drawings filed herewith. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 7, 2025
    Permit
    Foundation · Filing subsequent foundation application at subcellar.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)