Mechanical Systems · Herewith filing to INSTALL STEA &CONDE. PIPING FROM MER ECW39 TO PUMP AND TANK ROOM ECW39.2.INST. HIGH TO MED.PRESSURE STEAM REDUC STATION AND HIGHTO LOW PRESS. STEAM REDUCISTATION IN PUMP AND TANK ROOM ECW38Dis.& rem med & low press steam pip.&cond. pipi
Mechanical Systems · Herewith filing to INSTALL STEA &CONDE. PIPING FROM MER ECW39 TO PUMP AND TANK ROOM ECW39.2.INST. HIGH TO MED.PRESSURE STEAM REDUC STATION AND HIGHTO LOW PRESS. STEAM REDUCISTATION IN PUMP AND TANK ROOM ECW38Dis.& rem med & low press steam pip.&cond. pipi
No product keyword matched · NYC DOB building permits
Mechanical Systems · As approved by Borough Commissioner John Raine, we are filing an EMERGENCY GENERATOR ORIGINALLY PERMITTED AND INSTALLED UNDER INADVERTENTLY WITHDRAWN ALT 2 #100410878 MH WORK TYPE, TO SHOW EXISTING CONDITIONS APPROVED AND INSTALLED UNDER SUCH application.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Hot water interconnection through underground tunnel connecting 1275 York Avenue and 417 East 68 Street as per plans. No change of use, occupancy or egress.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Hot water interconnection through underground tunnel connecting 1275 York Avenue and 417 East 68 Street as per plans. No change of use, occupancy or egress.
No product keyword matched · NYC DOB building permits