Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/92ND STREET Y
Back to prospects

92ND STREET Y

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 9 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness3 / 5Latest signal is within 180 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
92ND STREET Y
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Jul 22, 2026
Source for Signal date (opens in new tab)
Signal count
19 saved signals, 0 in the last 90 days
Signal summary
Plumbing · PHASE 3.4 N9: ADDITION OF NEW BATHROOM. PROVIDE NEW PL SYSTEM TO SUPORT INSTALLATION OF NEW WC,S LAVS, SINKS, AND DF. CONNECT SANITARY, WAST, VENT, HOT/COLD WATER TO EXISTING DISTRIBUTION.
Source for Signal summary (opens in new tab)
Address
31-70 COLLEGE POINT BOULEVARD
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

19 signals
  • Jul 22, 2026
    Permit
    Plumbing · PHASE 3.4 N9: ADDITION OF NEW BATHROOM. PROVIDE NEW PL SYSTEM TO SUPORT INSTALLATION OF NEW WC,S LAVS, SINKS, AND DF. CONNECT SANITARY, WAST, VENT, HOT/COLD WATER TO EXISTING DISTRIBUTION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 16, 2026
    Permit
    Sprinklers · PHASE 3.4 N9: MODIFY EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH BUILDING ALTERATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    General Construction · PHASE 3.4 - N9: MODIFICATION TO INTERIOR NON-LOAD BEARING WALLS, CEILING, AND FINISHES. FLOORING. NO CHANGE TO OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION. CHANGE OF USE FILED AND APPROVED UNDER ALT-CO # M00695880-I1
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 10, 2026
    Permit
    Mechanical Systems · PHASE 3.4 - N9: MODIFICATION TO EXISTING MECHANICAL SYSTEM AND ASSOCIATED DUCTWORK.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 19, 2026
    Permit
    Standpipe · 3.3 SOUTH: MODIFICATION TO EXISTING STANDPIPE SYSTEM IN CONJUNCTION WITH SPRINKLER APPLICATION # M01130126-S4
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 4, 2026
    Permit
    Boiler Equipment · REMOVE TWO 15000 GALLON OIL TANKS. BOILERS TO RUN ON GAS ONLY
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 17, 2026
    Permit
    General Construction · PHASE 3.4 MINOR WORK AT NINTH FLOOR (NORTH WING) INCLUDING DEMOLITION OF NON-LOAD BEARING WALLS, CEILING, AND FINISHES. FLOORING AND BOTTOM 3 OF WALL TO REMAIN IN PLACE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 24, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF TEMPORARY BARRIER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 26, 2026
    Permit
    Structural · REPAIR EXISTING COOLING TOWER DUNNAGE AT ROOF OF SOUTH BUILDING INCLUDING STEEL BEAM REINFORCEMENT, PATCHING OF CONCRETE DUNNAGE FRAME AND TEMPORARY SHORING OF DUNNAGE AND MECHANICAL EQUIPMENT. .
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 4, 2026
    Permit
    Plumbing · PHASE 3.2 S3: MODIFY EXISTING SANITARY, VENT, DOMESTIC WATER AND GAS DISTRIBUTION IN CONJUNCTION WITH BUILDING ALTERATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 16, 2026
    Permit
    Protection and Mechanical Methods · Filing herewith for use of mechanical means DS1 in conjunction with application #M01080724-I1. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 6, 2026
    Permit
    Plumbing · PHASE 3.3 SOUTH: MODIFY EXISTING SANITARY, VENT, DOMESTIC WATER AND STORM DISTRIBUTION IN CONJUNCTION WITH BUILDING ALTERATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 6, 2026
    Permit
    Sprinklers · 3.3 SOUTH: MODIFICATION TO EXISTING SPRINKLER SYSTEM
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    General Construction · PHASE 3.3: Partial int. fitout including dismantling/installation of non-load bearing walls, doors, ceiling, floors, finishes, exterior repairs and glazing. Replace existing windows at 1st & 2nd floors.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Mechanical Systems · PHASE 3.3 SOUTH: REPLACE EXISTING SOUTH BUILDING DUAL DUCT SYSTEM WITH NEW MULTI ZONE DEDICATED OUTDOOR UNIT W/CHILLED/HW COILS ALONG W/ NEW VAVS & DUCTWORK. DOAS-SC-1 WILL PROVIDE VENTILATION AIR TO ALL OF THE SOUTH BASEMENT THRU 3FLS & PORTIONS OF S4-S
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Structural · PHASE 3.3 SOUTH TOWER: MINOR ALTERATIONS TO EXISTING BUILDING, INCLUDING NEW SLAB OPENINGS AND INFILLS AND NEW OPENINGS IN NON-STRUCTURAL EXTERIOR WALLS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 22, 2025
    Permit
    Mechanical Systems · ELECTRIFICATION OF DOMESTIC HOT WATER AND HEATING SYSTEM. INSTALLATION OF CONCRETE PAD. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 16, 2025
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 16, 2025
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)