Seer/Prospects/EAST82OWNER, LLC
Back to prospects

EAST82OWNER, LLC

Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
EAST82OWNER, LLC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 6, 2026
Source for Signal date (opens in new tab)
Signal count
20 saved signals, 7 in the last 90 days
Signal summary
Sprinklers · Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans.
Source for Signal summary (opens in new tab)
Address
4322 18TH AVE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

20 signals
  • Nov 6, 2026
    Permit
    Sprinklers · Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 6, 2026
    Permit
    Sprinklers · Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 28, 2026
    Permit
    Supported Scaffold · INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 28, 2026
    Permit
    Suspended Scaffold · INSTALLATION OF MULTI-POINT IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 28, 2026
    Permit
    Suspended Scaffold · INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 15, 2026
    Permit
    Plumbing · Installation of new plumbing system: Install new plumbing fixtures and associated piping on the Cellar, 1-38th Floor & Roof (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, RF1 (Marketing Floors) as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    Plumbing · Filing for installation of temporary toilet fixtures as per plans filed herewith. No change in use, egress or occupancy in this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 13, 2026
    Permit
    Curb Cut · Herewith filing curb cut on East 82nd Street. Work in conjunction with New Building #M00995463-I1, and BPP application #141025469.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 7, 2026
    Permit
    Boiler Equipment · Installation of three (3) new condensing boilers and associated pumps and suction diffusers on the 37th Floor (CO)/ M3 (Mktg) and install drain, flow bypass valve, differential pressure sensor and future boiler connections on the Cellar as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 6, 2026
    Permit
    Protection and Mechanical Methods · Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 17, 2026
    Permit
    Standpipe · TEMPORARY STANDPIPE INSTALLATION, ALL AS PER PLAN AND REFERENCE TO PERMANENT STANDPIPE UNDER M01030152.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF A TEMPORARY HOIST COMPLEX AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST COMPLEX INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 13, 2025
    Permit
    Mechanical Systems · Installation of new HVAC System throughout the building: Install new ductwork, intake air louvers, exhaust fans, Cooling tower, AC and Condensing Units, ductwork and pipe connections, refrigerant piping risers, DOAS, electric heaters, VAVs as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 13, 2025
    Permit
    Structural · Herewith filing Superstructure application filed in conjunction with New Building # M00995463-I1
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 12, 2025
    Permit
    Mechanical Systems · Installation of new emergency generator, wiring, piping and regulator vents on the 20th Floor (CO)/ M1 (Mktg) and emergency generator gas booster and gas meter and associated piping and regulator vents on the Cellar Level as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 12, 2025
    Permit
    Protection and Mechanical Methods · Installation and use of power operated hoisting equipment, specifically a 5-ton-push-trolley between the Ground floor and Cellar level.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 12, 2025
    Permit
    General Construction · HEREWITH FILING ERECTION OF NEW RESIDENTIAL BUILDING (tax lot 31).
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 7, 2025
    Permit
    Plumbing · Installation of new plumbing system: Install new plumbing fixtures and associated piping on the Cellar, 1-38th Floor & Roof (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, RF1 (Marketing Floors) as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 7, 2025
    Permit
    Standpipe · Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 7, 2025
    Permit
    Sprinklers · Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)