Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/MICHAEL F. ADANUNCIO ELEC
Back to prospects

MICHAEL F. ADANUNCIO ELEC

Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
MICHAEL F. ADANUNCIO ELEC
Source for Company (opens in new tab)
Signal source
NYC DOB electrical permits
Signal date
Nov 1, 2026
Source for Signal date (opens in new tab)
Signal count
7 saved signals, 1 in the last 90 days
Signal summary
Working on the 3 phase, 100-amp PLP meter with Con Edison.
Source for Signal summary (opens in new tab)
Address
559 MAPLE STREET, BROOKLYN, NY 11203
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

7 signals
  • Nov 1, 2026
    Permit
    Working on the 3 phase, 100-amp PLP meter with Con Edison.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jun 15, 2026
    Permit
    Replacing all cable work, receptacle outlets and lighting damaged by water in entire apts :1G, 1 H, 2G, 2H, 3G, 3H, 4G, 4H, 5G, 5H, 6G, 6H..
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 16, 2026
    Permit
    In Apt. 1E: Replacing main lug apt circuit breaker panel. Installing new wiring for receptacle outlets, switch outlets and lighting in kitchen, bathroom, bedroom, small office room, living area and apt hallway.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Mar 17, 2026
    Permit
    In Apt. 2K: Replacing apt panel, Installing all new lines for lighting and receptacles in studio apt. Bedroom, kitchen, bathroom, Hallways, Livingroom.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jan 19, 2026
    Permit
    3 receptacle outlets
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jan 15, 2026
    Permit
    Inapt. 4C: Replacing apt main lug circuit breaker panel. Installing all new wiring for light and receptacle outlets in kitchen, bedrooms, bathroom, apt hallway, closets and other area near hallway.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Dec 16, 2025
    Permit
    Installing a 40amp, 208-volt electric hot water heater line and disconnect. Replacing existing 1St floor main breaker panel to accommodate electric hot water heater circuit breaker.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)