General wiring installing five dedicated lines for AC condensers for Primary heating and cooling in apartment 1 front, apartment 2 front, apartment 2 rear, apartment 2 front and basement
General wiring installing five dedicated lines for AC condensers for Primary heating and cooling in apartment 1 front, apartment 2 front, apartment 2 rear, apartment 2 front and basement
No product keyword matched · NYC DOB electrical permits
General wiring for 5 AC condensers 4 in the front of the house 1 in the rear of the building also replacing two main service panels first floor and second floor reconnecting all existing loads.
No product keyword matched · NYC DOB electrical permits
General wiring unit 1, adding recessed lighting in bedroom kitchen, replacing receptacle and switch devices relocating receptacles in kitchen, using existing loads, New 240 V dedicated line for stove.
No product keyword matched · NYC DOB electrical permits
1-Dedicated 240v 45 amp line for a/c condenser at rear right side of house form the main panel for Primary heating and cooling electrical installation.1-Dedicated 240v 35 amp line for a/c condenser at rear right side of house form the main panel for Primary heating and cooling electrical installation
No product keyword matched · NYC DOB electrical permits
Service work 200 amp meter pan 200 amp main breaker panel reconnecting all existing loads this Permits superseding old permit number R122421 to be closed out after inspection
No product keyword matched · NYC DOB electrical permits
Installed recessed, lighting throughout house replacing switches and receptacles throughout house installed new subpanel picking up existing loads in basement
No product keyword matched · NYC DOB electrical permits
Combination of adjacent apartments 2A and 2B on the second floor General wiring installing new recessed lighting throughout apartments, using all existing loads replacing switches and receptacle devices.
No product keyword matched · NYC DOB electrical permits
1-Dedicated 240v 25 amp line for a/c condenser at left side of house form the main panel for Primary heating and cooling electrical installation.1-Dedicated 240v 25 amp line for a/c condenser at left side of house form the main panel for Primary heating and cooling electrical installation
No product keyword matched · NYC DOB electrical permits
1-Dedicated 240v 50 amp line for a/c condenser at left side of house form the main panels in basement for Primary heating and cooling electrical installation.
No product keyword matched · NYC DOB electrical permits
Service work installing new landlord meter pan and 100 amp main breaker Panel for common areas. Also installing new breaker panel in basement connecting common area loads to new breaker panel.
No product keyword matched · NYC DOB electrical permits
Installing new grounding and bonding system, water main ground and ground rod repairing in second floor rear bedroom, one light fixture and installing four new spotlights where existing wereDOB safety check inspection for meters
No product keyword matched · NYC DOB electrical permits