Connect the solar system to the main service via a line-side tap with microinverters. PLEASE NOTE: This is a re-file of Q01280376 due to the initial contractor's death and should be closed out with this permit in place of the original.
No product keyword matched · NYC DOB electrical permits
OBTAIN PERMIT FOR VIOLATION 039188566J AS REMEDY AND REMOVAL OF VIOLATION.VIOLATION 039188566J: ATOI OBSERVED AT REAR YARD, EXPO. 3, SMALL ABOVE-GROUND SWIMMING POOL, WITH ASSOCIATED ELECTRICAL CONNECTIONS INSTALLED.
No product keyword matched · NYC DOB electrical permits
OBTAIN PERMIT FOR VIOLATION 39185425M REMEDY & CORRECTION & REMOVAL OF VIOLATIONS 39185425M, 39185426Y.VIOLATION 39185425M: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE MAIN ELECTRIC RM ONE NEW PANEL INSTALLED WITH NEW CONDUITS ALSO NEW ELECTRIC HEATERS INSTALLED IN LOBBY AND WATER MAIN RM. THE HW TANK HAVE NEW SWITCHES FOR POWER. NO PERMIT ON FILE.VIOLATION 39185426Y: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPRATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE.
No product keyword matched · NYC DOB electrical permits
Obtain a permit for violation 39140293K and removal of violation.Violation 39140293K Details: Observed at front 24-foot-long PVC motorized gate installed. Electrical motor and outlet installed. No electrical permit for this work at the time of inspection. Remedy: Obtain permit
No product keyword matched · NYC DOB electrical permits
Obtain permit for violations 039185856Y & 039185855M: electrical work without a permit at exp 4 right side (1) disconnect box installed with electrical lines connected through facade of building to power (1) wall mounted hvac unit, no jobs or permits in dept. records for this electrical work. Remedy: obtain permit
No product keyword matched · NYC DOB electrical permits
General wiring for first floor, second floor, and cellar/basement. Installing 1 100-amp riser for the second floor. Installing 1 100-amp panel and 1 100-amp riser for the first floor. Replacing gang meter socket
No product keyword matched · NYC DOB electrical permits
OBTAIN PERMIT AS REMEDY FOR VIOLATION 039178369L.VIOLATION 039178369L DETAILS: ATOI OBSERVED 5 SPLIT AC UNITS WITH 5 DISCONNECT BOXES AT EXP .2 (3) AND EXP .4 (2). THERE ARE NO PERMITS OR JOB FILINGS AS PER DOB RECORDS. REMEDY: OBTAIN PERMIT
No product keyword matched · NYC DOB electrical permits
Removal of the Stop Work Order from violation 039152036H to obtain a permit for electrical work. Electrical work includes correcting exposed bx cables.Violation: AT TIME OF INSPECTION OBSERVED AT ALL EXPOSURES EXPOSED BX CABLES PROTRUDING THROUGH FACDE. NO PERMITS ON FILE WITH DOB FOR ELECTRICAL WORK.Remedy: BTAIN PERMIT
No product keyword matched · NYC DOB electrical permits
Upgrade service and general wiring. Light fixtures, outlets, switches, AC blower motors, and ceiling fans have been installed on each of the 4 floors. 1 stove and 1 hot water tank were installed per floor (4 floors total). 4 condensers were also installed on the roof, one for each floor.
No product keyword matched · NYC DOB electrical permits