Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/G. POULAKIS ELEC'L CONTR'
Back to prospects

G. POULAKIS ELEC'L CONTR'

Queens, Manhattan, Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
G. POULAKIS ELEC'L CONTR'
Source for Company (opens in new tab)
Signal source
NYC DOB electrical permits
Signal date
Nov 3, 2026
Source for Signal date (opens in new tab)
Signal count
15 saved signals, 5 in the last 90 days
Signal summary
temp power panel and temp lighting streamers for construction site power fed from next door building 18-14 128th street
Source for Signal summary (opens in new tab)
Address
18-40 42ND STREET, ASTORIA, NY 11105
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

15 signals
  • Nov 3, 2026
    Permit
    temp power panel and temp lighting streamers for construction site power fed from next door building 18-14 128th street
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Oct 23, 2026
    Permit
    remove existing lobby lighting and install new lighting utilizing existing lighting circuits. remove existing wall outlets and replace with new outlets utilizing same power circuits. install -3- wall mounted lights outdoor and install lighting on outdoor steel canopy utilizing existing light circuits. discard and remove all dead and unused wiring in lobby ceiling and walls.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Sep 28, 2026
    Permit
    Apt 9B- install new light fixtures utilizing existing wiring, install new appliances utilizing existing wiring, install new switches, outlets, and GFI's utilizing existing wiring. existing riser and electrical panel to be reused.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 19, 2026
    Permit
    temporary power for temporary boiler trailer for temporary heat and hot water
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 19, 2026
    Permit
    installation of temporary power for temporary outdoor trailer boiler for heat and hot water
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jul 30, 2026
    Permit
    wiring of new boiler replacing existing old boiler
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jun 10, 2026
    Permit
    temporary power for temporary boiler for temporary heat and hot water
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jun 10, 2026
    Permit
    new 4 gang meter pan, new -200 amp building main service switch utilizing existing Con Edison incoming service new end box, 3 new apartment disconnects, 1 PLP panel reusing existing circuits, new risers to first floor and 2nd floor apartments, and 2 new apartment panels 1st and 2nd floor. reusing existing circuits in 2nd fl reusing existing riser and circuits on 3rd floor apartment. 1st fl apt rewire. hall, stair lights, back yard light, GFI,
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 30, 2026
    Permit
    temporary power for temporary outdoor boiler for temporary heat and hot water
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 30, 2026
    Permit
    remove existing defective hanging wiring in basement and first floor to make safe in stores 32-90 and 32-88, install new light fixtures in public rear hall of basement. install 2 new 200 amp and -1- 400 amp -3- phase electrical panels with risers on ground level in stores 32-90 and 32-88. new 2000 amp service and 2000 amp disconnect for building . New PLP panel and meter , new meters and disconnects for all stores, using existing feeders for -4- existing operating retail stores.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 29, 2026
    Permit
    install temporary power for temporary outdoor boiler for temporary heat and hot water for building
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Mar 18, 2026
    Permit
    new sauna power for -2- new sauna locations mens and womens rooms. removal of old wiring. installation of new lighting and power in same area. utilizing existing electrical panels. power for 1 new ac unit on roof and 8 air handler units on 3rd floor
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Mar 18, 2026
    Permit
    Remove existing power outlets, lighting and unused existing circuits. Install new branch circuits for power outlets and lighting for expansion of gym taking over former Starbucks also know as 910 Manhattan Ave. The existing power panels to remain and be used. Existing branch circuits to be used as needed. also install power panel and power for new water heater for café area on ground level at entrance area of 147 green point from existing distribution panel in Basement of 147 Greenpoint Ave.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jan 16, 2026
    Permit
    install -1- 3 phase sub panel on ground floor from the existing store electrical panel located in basement only no branch wiring or other electrical work included.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Dec 9, 2025
    Permit
    wiring of -1- spa whirlpool -1- sauna room -1- steam room in mens locker room area and the same in womens locker room area remainder of work on other permit
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)