AMR ELEC'L CONTRG CORP

Queens, Brooklyn, Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 10 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
AMR ELEC'L CONTRG CORP
Source for Company (opens in new tab)
Signal source
NYC DOB electrical permits
Signal date
Sep 30, 2026
Source for Signal date (opens in new tab)
Signal count
12 saved signals, 1 in the last 90 days
Signal summary
Underground electrical conduits for lighting circuits and branch circuits. Pull strings, sleeves, and underground junction/handhole boxes.
Source for Signal summary (opens in new tab)
Address
1521A Boone Ave, BRONX, NY 10460
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

12 signals
  • Sep 30, 2026
    Permit
    Underground electrical conduits for lighting circuits and branch circuits. Pull strings, sleeves, and underground junction/handhole boxes.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 20, 2026
    Permit
    New Apartment Panels and new feeders. New circuits for apartment HVAC. New 40amp stove circuit in each apartment. Replace fixtures, switches,and outlets at existing location with existing branch wiring. Existing service end box. Upgrade service. Relocate existing meter, install new meter
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 19, 2026
    Permit
    Install one new electrical meter, and one new disconnect switch. Intercept existing feeder currently feeding panel P-3 and re-route to new disconnect switch. All existing electrical to remain
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 15, 2026
    Permit
    Apartment 5KReplace existing fixtures with new fixtures. Furnish and install wiring for new light fixtures in foyer closet, living room, and dining room. Add new receptacles outlets in bedrooms, and for air conditioners units. Replace existing switches with new. existing panel to remain.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 13, 2026
    Permit
    Install new rooftop generator, new 800A, 400A, 100A, and 30A service switches, new DP-EM panel, and new generator, and new generator distribution panel. Provide power for new elevator and install emergency exit signs at staircases.Existing coned service end box to remain.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Mar 30, 2026
    Permit
    Install a new 1600amp distribution added to existing service. New panels on floors 3,6,9,12, and 13. New branch circuits for electric stoves and air handlers from new distribution panels. Replace existing apartment panels with new, reconnect existing circuits, with all wiring remaining within the apartments. Provide power for all new mechanical units. Installation of new fire alarm system.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Mar 28, 2026
    Permit
    Replace existing light fixtures with new. Add wiring and junction boxes for new light fixtures and switches in kitchen/family room. Apartment 5B
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Feb 19, 2026
    Permit
    Temporary power for construction equipment.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Dec 20, 2025
    Permit
    Temp Hoist wiringTemp Standpipe wiring Temp power and lighting throughoutTemp Elevator feeder
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Dec 20, 2025
    Permit
    New power and lighting branch circuits throughout the cellar, first floor,2nd floor, and roof. New fire alarm system. New wiring for HVAC system. New panel and feeder on the 2nd floor. Existing electrical service and elevator to remain.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Dec 17, 2025
    Permit
    Electrical New construction residential building, cellar, 1st through 10th floors, and roof. New electrical service switchgear, meter banks, apartment panels, house panels, and complete new electrical wiring throughout. Approved EPR plans
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Dec 2, 2025
    Permit
    Temporary light and power throughout
    No product keyword matched · NYC DOB electrical permits