Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/ADMIRAL ELECTRIC LLC
Back to prospects

ADMIRAL ELECTRIC LLC

SEATTLE, Bronx, Queens, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 14 / 20Tier A
Keyword
Seer chat
3 / 5
0 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
ADMIRAL ELECTRIC LLC
Source for Company (opens in new tab)
Signal source
Seattle electrical permits · NYC DOB electrical permits
Signal date
Oct 31, 2026
Source for Signal date (opens in new tab)
Signal count
51 saved signals, 16 in the last 90 days
Signal summary
100A sub panel added to replace existing shed panel with "questionable" 30A overhead strike. 30A Sauna heater, 15A lighting, 20A outlet circuit, 2 x 20A shed circuits rewired. · Electrical
Source for Signal summary (opens in new tab)
Address
3011 Avenue L, BROOKLYN, NY 11210
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

51 signals
  • Oct 31, 2026
    Permit
    100A sub panel added to replace existing shed panel with "questionable" 30A overhead strike. 30A Sauna heater, 15A lighting, 20A outlet circuit, 2 x 20A shed circuits rewired. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 31, 2026
    Permit
    Kitchen remodel with several other circuits added. 50A furnace back up circuit, 50A EV circuit, and 1-2 circuits rewired throughout non kitchen portions of the home. Full kitchen remodel in new location, minor changes to dining room and main floor lighting. 100A sub panel added for remodel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    Service and Panel upgrade to 200A. Subpanel and main panel rewired to one 40 space 200A panel. Meter moved to other side of house with adequate clearance. Grounding and bonding updated. Last remaining knob and tube circuit: two outlets, two lights, and two switches - rewired. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    Like for like kitchen remodel. No new circuits pulled from panel. Slight adjustment to outlet locations for undercabinet outlets, range and dishwasher. Two overhead lights added as well as LV lighting. No other additions and no work outside of kitchen. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    200A Service Upgrade with meter removed from deck area and relocated. Feed through meter/disconnect combo. Updated grounding and bonding. No circuits added or changes to interior panel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    Replacement of old 200A Zinsco panel with new Eaton BR 40 space panel. Updated grounding and bonding with ground rods added. Surge protector added, and 30A generator interlock. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 5, 2026
    Permit
    General Wiring
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Sep 29, 2026
    Permit
    60amp dedicated Kiln circuit. Wired from CH panel in house to disconnect in attached garage. Disconnect added at client's request. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 28, 2026
    Permit
    125A garage subpanel added with ground rods (separate structure). 2/0 Aluminum for 125A feeder. No other garage electrical at this time. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 21, 2026
    Permit
    Whole house rewire of all knob and tube wiring. 200A Service Upgrade and new 200A panel. Updated grounding and bonding. Clean up of electrical throughout house and basement laundry area. Gas dryer wired for electric, minimal electrical in kitchen pending future kitchen remodel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 15, 2026
    Permit
    meter reset apartment b
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Sep 14, 2026
    Permit
    Unit remodel with a full kitchen redo. Small additional electrical in other areas of the unit - primarily bidet outlets and minor lighting changes. Barrel ceiling area will have new lighting and potentially a new gas or electric fireplace. New kitchen with new appliances and a redone laundry room. Panel replaced with new 40 space. Unit 601. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 11, 2026
    Permit
    Remodel of kitchen with the majority of appliances staying in their existing location. Outlets added to be within 2' of sink and outlets added on either side of range. Dedicated micro/vent hood, and dedicated dishwasher and disposal - no other significant electrical changes. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 6, 2026
    Permit
    Add 125A subpanel in garage, several outlets, and clean up general electrical work around panel. Add garage wiring and dedicated circuits: Sauna, Water Heater, HVAC, Car Charger · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 24, 2026
    Permit
    Rewire the knob and tube throughout the house, kitchen and bathroom previously rewired, dining circuit added for kitchen nook along with circuit for disposal. House panel initially fed by 125 Amp breaker-change to feed through panel and 200 Amp feed to house. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 15, 2026
    Permit
    Rewire of remaining knob and tube wiring. Wiring throughout house eliminated and rewired. Kitchen and bathroom previously remodeled/rewired. Majority of knob and tube on upper floors, with several tie ins to lower floors. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 11, 2026
    Permit
    Taking over a project for 8649 17th Ave SW. We have come in after the drywall stage (cover passed by previous electrician). We have inspected all electrical and found it satisfactory as well as completing the trim out electrical. The original permit seemed to have everything covered, but we will add whatever else is needed. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 10, 2026
    Permit
    Meter reset Apartment first floor (a)
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    Replacement of old Federal Pacific panel with new Eaton BR panel. Updated grounding and bonding. No other circuit additions or changes. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    Installation of plug mold outlets in kitchen and other kitchen fixes. Adding igniter outlet behind range and vent hood circuit/outlet. Movement of dryer outlet to dryer location (extension of circuit). New dual function breakers added. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)