NEW CONSTRUCTION 7 STORY 185 APARTMENTS: TEMPORARY POWER FOR PERSONNEL HOISTS. 600A 208 volts. Removal of the two temp generators previously added as we are no longer powering hoists w temp generators. We are powering with the temp service.
NEW CONSTRUCTION 7 STORY 185 APARTMENTS: TEMPORARY POWER FOR PERSONNEL HOISTS. 600A 208 volts. Removal of the two temp generators previously added as we are no longer powering hoists w temp generators. We are powering with the temp service.
No product keyword matched · NYC DOB electrical permits
New conduit for con-ed POE, due to damaged service feeders. Install 200amp bypass meter pan for PLP area with 100amp 2 separate meter pan for 2 apartment with 100 main.
No product keyword matched · NYC DOB electrical permits