Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/GOTHAM TECHNICAL SERVICES
Back to prospects

GOTHAM TECHNICAL SERVICES

Manhattan, Brooklyn, Queens, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
GOTHAM TECHNICAL SERVICES
Source for Company (opens in new tab)
Signal source
NYC DOB electrical permits
Signal date
Nov 2, 2026
Source for Signal date (opens in new tab)
Signal count
15 saved signals, 3 in the last 90 days
Signal summary
PROVIDE (2) 40 AMP 3 PHASE FEEEDS FOR TWO FUTURE BATTERY CHARGING STATIONS
Source for Signal summary (opens in new tab)
Address
218-14 NORTHERN BLVD, BAYSIDE, NY 11361
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

15 signals
  • Nov 2, 2026
    Permit
    PROVIDE (2) 40 AMP 3 PHASE FEEEDS FOR TWO FUTURE BATTERY CHARGING STATIONS
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Oct 27, 2026
    Permit
    New sub panel to service new wine room power needs in PH apt
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 18, 2026
    Permit
    Upgrade electrical panel add 12 lights, 10 outlets, 1 smoke carbon
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Aug 11, 2026
    Permit
    UPGRADE ELECTRICAL OUTDOOR METERING EQUIPMENT. IT IS RUSTED AND FALLING APART. NO WORK BEING DONE ON THE INSIDE EQUIPMENT
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jul 28, 2026
    Permit
    Replace Rusted Con Edison End Line Box /POE Box
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jul 7, 2026
    Permit
    Replace Circuit breaker panel and extend existing circuits
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 13, 2026
    Permit
    ADD FIRRE PUMP/CONTROLLER
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 13, 2026
    Permit
    ADD FIRE PUMP SWITCH/CONTROLLER
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 13, 2026
    Permit
    ADD FIRE PUMP SWITCH/CONTROLLER
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 7, 2026
    Permit
    Add outdoor lighting to building facade
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Apr 17, 2026
    Permit
    Repair damaged feeder. Replace section of damaged feeder that burned out
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Apr 16, 2026
    Permit
    Adding SERVICE WORK NOTIFY UTILITY to application B01316221. All Equipment being replaced is listed on the main permit associated with this permit which was issued on 11/10/25. Did not check box for Service work
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jan 31, 2026
    Permit
    Adding one new 3 phase feeder to feed a new 3 phase panel in the boiler room. Feed six new motors in the boiler room.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Nov 20, 2025
    Permit
    filling for removal of 2 apt meters. Work was done but no record of removal exist so we are now filing to update records with thhe city
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Nov 10, 2025
    Permit
    Replace (2) 800 amp switches (PLP & Fire Pump) Replace (2) 1200 amp service switches (Feed two existing Meter Banks) Replace (2) 400 amp Fused Discos (elevator and boiler ) Replace (2) 800 amp Panels Replace (1) 400 amp panel (2) 200 amp panel. THIS JOB IS ADVISORY BOARD
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)