Installing 200-amp by-pass meter pan and a Single-phase panel up to 125 amps on (1) Charter/Spectrum power supply, which already exists at the location.
No product keyword matched · NYC DOB electrical permits
Installing 200-amp by-pass meter pan and a Single-phase panel up to 125 amps on (1) Charter/Spectrum power supply, which already exists at the location.
No product keyword matched · NYC DOB electrical permits