Service upgrade to 200A single-phase; install five 200A single-phase service switches and five single-phase panels (20 circuits each); install four sets of 2/0 aluminum conductors; retain five existing 3-wire meters; no Con Edison work. General wiring: 10 receptacles and 10 switches each on basement, 1st, 2nd, 3rd, and 4th floors (50 each).
Service upgrade to 200A single-phase; install five 200A single-phase service switches and five single-phase panels (20 circuits each); install four sets of 2/0 aluminum conductors; retain five existing 3-wire meters; no Con Edison work. General wiring: 10 receptacles and 10 switches each on basement, 1st, 2nd, 3rd, and 4th floors (50 each).
No product keyword matched · NYC DOB electrical permits
Commercial space only. General wiring. New 208V 3-phase gear: two 400A panels, two 200A panels, one 1600A main-lug. 15 air handlers at 15A, 12 electric water heaters at 30A, two roof condensers at 200A, four roof condensers at 60A, two fans at 20A.