Structural · Interior renovation including partial removal of wood-stud bearing wall. Temporary shoring for floor joists provided. New steel-framed deck in rear yard.
Structural · Interior renovation including partial removal of wood-stud bearing wall. Temporary shoring for floor joists provided. New steel-framed deck in rear yard.
No product keyword matched · NYC DOB building permits
Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Install 2 ton capacity VRF Condensing unit with 2 associated fan coil units for the basement unit. Remove and relocated two 3 ton VRF condensing units as per plans. obtain 1 certification of compliance as per BC 110.6 and 28-116.4.1 for the new system.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR RENOVATION OF BASEMENT FLOOR AND IST FLOOR OF RESIDENTIAL SPACE. MECHANICAL, PLUMBING AND STRUCTURAL FILED ON SUBSEQUENTS TO APPLICATION. WORK UNDER 1968 BUIDING CODE. EXISITING 2 FAMILY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits