General Construction · FILING TO REPLACE EXG FILL PORT SPILL CTNR OF (2) 3,000-GAL GAS, (1) 3,000-GAL RENEW DL, (1) 2,000-GAL MOT OIL, (1) 2,000-GAL HYD OIL USTS, EXG TANK TOP SUMPS OF (2) 3,000-GAL GAS, AND (1) 3,000-GAL RENEW DL USTS WITH DW EQ WITH IEM SENSORS, AND ALL ACCS.
No product keyword matched · NYC DOB building permits
General Construction · INSTALL 1,000-GALLON DW FRP R95DIESEL UST, 1,000-GALLON GASOLINE UST, ONE (1)R95 DIESEL AND ONE (1) GASOLINE FUEL DISPENSER WITH DOUBLE-WALL UDC, PIPING, ONE FIRE SUPPRESSIONSYSTEM AND SUPPORTS, AND ONE (1) VEEDER-ROOT. NO CHANGE TO USE OR EGRESS.
No product keyword matched · NYC DOB building permits
Boiler Equipment · REMOVAL OF 6,000-GALLON #2 FUEL OIL UST, AND VEEDER-ROOT TLS-350R. INSTALL ONE (1) 4,000-GALLON DW FRP #2 FUELOIL UST, RETURN AND SUPPLY PIPING TO EXISTING DAYTANK, AND VEEDER-ROOT TLS-450 PLUS. TANK TO BE REPLACED IN KIND. NO CHANGE TO USE OR EGRESS
No product keyword matched · NYC DOB building permits
Support of Excavation · EXCAVATE AND INSTALL A 24' X 21' X 10' DEEP STEEL H-PILE AND TIMBER LAGGING SUPPORT OF EXCAVATION SYSTEM TO FACILITATE THE REQUIRED UNDERGROUND FUEL STORAGE TANK REPLACEMENT ON SITE
No product keyword matched · NYC DOB building permits
Support of Excavation · EXCAVATE AND INSTALL A 27' x 13' x 13' DEEP INTERLOCKING STEEL SHEET PILE AND STEEL WALER SUPPORT OF EXCAVATION SYSTEM TO FACILITATE THE REQUIRED UNDERGROUND FUEL STORAGE TANK REPLACEMENT ON SITE.
No product keyword matched · NYC DOB building permits
Structural · EMPTY, PURGE, CLEAN, REMOVE AND DISPOSE OF (1) 4,000-GALLON ETHANOL UST, FUEL ISLAND, ASSOCIATED PIPING AND LEAK DETECTION SYSTEM COMPONENTS. INSTALL (1) 4,000-GALLON RD95B5 UST, FUEL ISLAND, ASSOCIATED PIPING AND LEAK DETECTION SYSTEM COMPOMENTS.
No product keyword matched · NYC DOB building permits
General Construction · FILING TO REPLACE EXG FILL PORT SPILL CTNR OF (2) 3,000-GAL GAS, (1) 3,000-GAL RENEW DL, (1) 2,000-GAL MOT OIL, (1) 2,000-GAL HYD OIL USTS, EXG TANK TOP SUMPS OF (2) 3,000-GAL GAS, AND (1) 3,000-GAL RENEW DL USTS WITH DW EQ WITH IEM SENSORS, AND ALL ACCS.
No product keyword matched · NYC DOB building permits
General Construction · EMPTY PURGE, CLEAN, AND REMOVE ONE (1) 2,000-GALLON FUEL OIL UST, REMOVE ABOVEGROUND AND EXPOSED UNDERGROUND PIPING AND EQUIPMENT, AND CLEAN AND CLOSE IN-PLACE UNEXPOSED UNDERGROUND PIPIN AS PER PLANS.
No product keyword matched · NYC DOB building permits