Supported Scaffold · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Supported Scaffold · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Full Demolition · full demolition of two story structure, with mezzanine and cellar, and will be using hand held and mechanical means to assist from within from grade.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed, roof and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched · NYC DOB building permits
Structural · Structural Work as shown on plans filed herewith. ALTERATION OF EXISTING FLOORS TOCREATE NEW SLAB OPENINGS AT CELLAR, CRAWLSPACE, BASEMENT, AND 1ST FLOORROOF.
No product keyword matched · NYC DOB building permits
General Construction · Renovation of existing office space, consisting of partial ceiling replacement, minor partition modifications, new roof membranes at bulkheads, & installation of a mechanical screen as per plans filed herewith. No change in Use, Egress or Occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Interior renovations on 2nd floor for partial ceiling replacement, minor partition work, and the addition of a classroom, bathroom, and closet as per plans filed herewith. No change in Use, Egress or Occupancy.
No product keyword matched · NYC DOB building permits
Structural · STRUCTURAL WORK AS PER PLANS FILED HEREWITH. WORK INCLUDES NEW STEEL DUNNAGE, FRAMING AND OPENINGS. AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · Engineered enclosure system will be installed to protect protect site. Mechanical equipment will assist with demolition from exterior.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed, roof and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched · NYC DOB building permits