Plumbing · CONVERSION OIL TO GAS BOILER AND INSTALL NEW BATHROOM AT 1ST FLOOR,2ND FLOOR, REPLACED ALL OTHER PLUMBING FIXTURE. NO CHANGE IN USE EGRESS OR OCCUPANCY
Plumbing · CONVERSION OIL TO GAS BOILER AND INSTALL NEW BATHROOM AT 1ST FLOOR,2ND FLOOR, REPLACED ALL OTHER PLUMBING FIXTURE. NO CHANGE IN USE EGRESS OR OCCUPANCY
No product keyword matched · NYC DOB building permits
Structural · HORIZONTAL EXTENSION AT REAR YARD AND OTHER REPAIR WORK(CELLAR,1ST AND 2ND FLOOR) AS PER PLAN. ALSO REMOVE EXISTING NON-COMPLYING FIRE ESCAPE AT FRONT FACADE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
No product keyword matched · NYC DOB building permits
Plumbing · CAP AND REMOVE ILLEGAL GAS RANGE, KITCHEN SINK,AND BATHTUB IN CELLAR TO RESTORE TO PRIOR LEGALCONDITION AND COMPLY WITH ECB VIOLATION 34215195Z.ALL PLUMBING FIXTURES WILL BE REPLACED WITH NEWFIXTURES USING EXISTING ROUGHING. THERE WILL BE NOCHANGE IN USAG
No product keyword matched · NYC DOB building permits
General Construction · APPLICATION TO REPAIR EXISTING ONE STORY GARAGE. INCLUDING SEVERAL BRICK MASONRY CRACKS AT PARAPET AT EXP#1 ALSO REPAIR GATES EXP #1/2 & EXP# 1/4 AS PER PLAN TO RESOLVE ECB VIOLATION #39043617N AND DOB VIOLATION##010726CPI30501SB.NO CHANGE IN USE, EGRESS
No product keyword matched · NYC DOB building permits