General Construction · Filing to convert 4 thru 6th floor from Mercantile Use to Offices U.G B. application file in conjunction with DOB Now application#M01290151-I1
General Construction · Filing to convert 4 thru 6th floor from Mercantile Use to Offices U.G B. application file in conjunction with DOB Now application#M01290151-I1
No product keyword matched · NYC DOB building permits
Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched · NYC DOB building permits
Sprinklers · SPRINKLER (SP) WORK IN CONNECTION WITH COMMERCIAL INTERIOR FIT-OUT ON THE 32ND FLOOR. SCOPE INCLUDES MODIFICATION, RELOCATION, AND INSTALLATION OF SPRINKLER HEADS AND ASSOCIATED BRANCH PIPING TO ALIGN WITH REVISED CEILING AND PARTITION LAYOUT. NO CHANGES
No product keyword matched · NYC DOB building permits
Mechanical Systems · MECHANICAL SYSTEMS (MS) WORK IN CONNECTION WITH COMMERCIAL INTERIOR FIT-OUT ON THE 32ND FLOOR. SCOPE INCLUDES REUSING AND/OR RELOCATING EXISTING SUPPLY AND RETURN AIR TERMINALS, INSTALLATION OF ASSOCIATED DUCTWORK MODIFICATIONS, AND RE-BALANCING AIR TERMI
No product keyword matched · NYC DOB building permits
General Construction · Interior renovation on the 32nd floor for commercial office use. Work to include new interior non-load bearing partitions, doors, finishes, and millwork. No change to building egress, use, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · INFILL OF EXISTING ESCALATOR AND ELEVATOR FLOOR OPENINGS ON THE 4TH, 5TH, AND 6TH FLOORS. NO CHANGE IN USE. OCCUPANCY OR EGRESS.
No product keyword matched · NYC DOB building permits
Structural · FILING FOR STRUCTURAL WORK;- WORK INCLUDE CREATING NEW OPENING TO RECEIVED NEW STAIR AT THE 7TH FLOOR ROOF TERRACE INSTALL NEW HEADER JOIST AND NEW STEEL BEAM AS PER PLANS FILED
No product keyword matched · NYC DOB building permits
Structural · FILING FOR STRUCTURAL WORK;- WORK INCLUDE CREATING NEW OPENING TO RECEIVED NEW STAIR AT THE 7TH FLOOR ROOF TERRACE INSTALL NEW HEADER JOIST AND NEW STEEL BEAM AS PER PLANS FILED
No product keyword matched · NYC DOB building permits