Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/KBRNY, INC
Back to prospects

KBRNY, INC

Bronx, Manhattan, Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
KBRNY, INC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 2, 2026
Source for Signal date (opens in new tab)
Signal count
11 saved signals, 5 in the last 90 days
Signal summary
General Construction · To combine units 1R & 1S under TPPN 3/97. Minor interior partition changes, remove kitchen in unit 1R, other work as per plan. No change to egress, occupancy, use, zoning or room count proposed.
Source for Signal summary (opens in new tab)
Address
838 6TH AVE 5TH FLOOR
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

11 signals
  • Nov 2, 2026
    Permit
    General Construction · To combine units 1R & 1S under TPPN 3/97. Minor interior partition changes, remove kitchen in unit 1R, other work as per plan. No change to egress, occupancy, use, zoning or room count proposed.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 8, 2026
    Permit
    General Construction · Interior renovation to existing kitchen and replacing of tile flooring in the bathroom. There will be no change proposed to use, occupancy, egress and bulk of the building under this application
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 11, 2026
    Permit
    General Construction · Proposed renovation of unit 10H at 404 East 79th Street, NY, includes reconfiguration of the existing bathroom 02. Replacement of existing toilet in-place at bathroom 01. Demolition and installation of non-structural partition walls.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    General Construction · Renovation of existing kitchen. Remove and install partitions, doors and finishes. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    General Construction · APPLICATION FILED FOR INTERIOR RENOVATION &RELATED PLUMBING WORK OF APT 22 ON 2NDFLOOR. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 24, 2026
    Permit
    General Construction · ALTERATION HEREWITH FILED FOR RENOVATION OF AN EXISTING APARTMENT AT THE 6TH FLOOR OF AN EXISTING 12-STORY AND CELLAR. RENOVATION INCLUDES GUT REHAB OF KITCHEN IN APARTMENT 6CNO CHANGE IN OCCUPANCY, USE, EGRESS, AND BULK.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 20, 2026
    Permit
    General Construction · Interior renovation of the ex. unit 14B includes reconfiguration of the kitchen, w/ replacement of plumbing fixtures. Removal of ex. non-structural partition walls and addition of new partition walls. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 17, 2026
    Permit
    General Construction · Renovation apt 1801/1815. Remove and install interior partitions, doors and finishes. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 6, 2026
    Permit
    General Construction · Renov. of unit at 142 E 16th Street Apt. 5A includes reconfiguration of ex. kitchenette, renov. of ex. bathroom, including replacement of tile flooring, bathtub, toilet, vanity, sink & faucet, renovation of primary bedroom. No change in use, egress/occup
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 19, 2026
    Permit
    General Construction · RENOVATION TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD BEARING INTERIOR PARTITIONS AND FINISHES. REPLACE PLUMBING FIXTURES AS PER SCHEDULE B AND PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 6, 2025
    Permit
    General Construction · COMBINATION OF EXISTING APARTMENTS 308 and 309, TO COMPLY WTH TPPN 03/97. RENOVATION TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD-BEARING INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)