Protection and Mechanical Methods · EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Protection and Mechanical Methods · EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
No product keyword matched · NYC DOB building permits
Structural · Floor slab and steel framing removal for elevator shaft and new openings pouring of foundation of new elevator pit New steel framing and concrete on metal deck slab installation New rooftop equipment support, no change to use or occupancy
No product keyword matched · NYC DOB building permits
General Construction · Construct new 12 Story building with UG II AIRS Residential and UG III Community facility Supportive Housing (NPISA) as per plans filed
No product keyword matched · NYC DOB building permits
General Construction · ALT-CO TO REFLECT CHANGE OF OCCUPANCY OF OFFICES AT 2ND AND 3RD FLOOR TO DWELLING UNITS AND RECONFIGURATION OF SRO UNITS AT 4TH THROUGH 8TH FLOOR TO DWELLING UNITS. INTERIOR AND EXTERIOR RENOVATION OF EXISTING COMMUNITY FACILITY.
No product keyword matched · NYC DOB building permits