Plumbing · PROPOSED PLUMBING WORK AT 1ST FLOOR - APARTMENT #107 ONLY. ALL FIXTURES ARE TO BE REPLACED IN-KIND ON EXISTING ROUGHING. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY UNDER THIS FILING.
No product keyword matched · NYC DOB building permits
Plumbing · AN EXISTING MIXED USE BUILDING WITH PLUMBING WORK IN EXISTING COMMERCIAL STORE ON PARTIAL OF 1ST FLOOR IN CONJUNCTION WITH JOB # B01380156-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY
No product keyword matched · NYC DOB building permits
Plumbing · Install 2PC bath (Lavatory, Toilet), washing machine and cap and remove gas line for dryer in the cellar. No change in use, egress, occupancy.
No product keyword matched · NYC DOB building permits
Plumbing · Plumbing alteration for renovation of supermarket on 1st floor and cellar, including new plumbing fixtures, sanitary, domestic water and vent piping, thermostatic mixing valves for hand sinks, and new BFP. No work to main stacks or city connections.
No product keyword matched · NYC DOB building permits
Plumbing · NEW INSTALLATION OF ONE (1) GAS HOT WATER HEATER TO REMOVE ECB VIOLATION #39168447Z, 39168448KL ON 2ND FLOOR. NO CHANGE IN USE, OCCUPANCY, EGRESS OR STRUCTURE UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Plumbing · INSTALLATION OF NEW PLUMBING INCLUDE SANITARY, VENT, DOMESTIC H/C WATER PIPING, HOT WATER HEATER. NEW BRANCH MAINS AND SPRINKLER DISTRIBUTION ON FIRST FLOOR, MEZZANINE, AND CELLAR.
No product keyword matched · NYC DOB building permits
Plumbing · PROPOSED CAFE IN EXISTING COMMERCIAL SPACE INCLUDING FINISHES, LIGHTING, ELECTRICAL, PLUMBING AND HVAC SYSTEM. PROPOSED NEW STOREFRONT AND NEW STAIR BULKHEAD AT ROOF.NO CHANGE IN USE, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits