Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Consolidated Edison of New York
Back to prospects

Consolidated Edison of New York

Queens, Brooklyn, Staten Island, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Consolidated Edison of New York
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 5, 2026
Source for Signal date (opens in new tab)
Signal count
62 saved signals, 14 in the last 90 days
Signal summary
Mechanical Systems · Install (3) 12K BTU Ceiling Cassettes with 36K BTU Condenser new install with Fresh Air intake. No change to occupancy, use or egress
Source for Signal summary (opens in new tab)
Address
326-328 FRONT STREET
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

62 signals
  • Nov 5, 2026
    Permit
    Mechanical Systems · Install (3) 12K BTU Ceiling Cassettes with 36K BTU Condenser new install with Fresh Air intake. No change to occupancy, use or egress
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 5, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    Supported Scaffold · INSTALLATION OF THE ACCESS SYSTEM SCAFFOLD @ BLDG.136 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SYSTEM SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 30, 2026
    Permit
    Boiler Equipment · HEREWITH FILING FUEL STORAGE WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 23, 2026
    Permit
    General Construction · Masonry wall repairs for facade replacement as indicated on plans, replacement in kind of exterior staircases. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    General Construction · Window replacement and exterior stairway replacement in kind. No change to use, occupancy, or egress
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 20, 2026
    Permit
    General Construction · remove existing asphalt in the lot with in the area of work, install new subsurface stormwater infiltration system, repave the area with new asphalt, replace existing fence in place with new foundations and grounding see comments
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    General Construction · Replace perimeter fence as per plans. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 9, 2026
    Permit
    Structural · See comments.Demo ex. steel dunnage syst@roof level,inst.new one to support rooftop equip. New dunnage t/be anchored to existing roof structural framing to be reinforced. Local.concrete infill of existing roof opening cons. pads@ground fl. Bolts Struc joi
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 15, 2026
    Permit
    Plumbing · Removal of existing gas fired unit heater and rooftop unit and cap existing gas pipe back to gas main.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    General Construction · Replacement of existing interior roll-up door at the building.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    Mechanical Systems · Replacing nine (9) gas-fired rooftop HVAC units with electric heat pump units. Installation if infrared heaters throughout garage
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    Structural · Propose to install new canopy and new pre-engineered kiosk. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 14, 2026
    Permit
    Mechanical Systems · REPLACEMENT OF OUTDOOR YORK ROOFTOP UNIT (UNIT 7) ON SOUTHEAST CORNER OF THE ROOF. NO CHANGE TO OCCUPANCY, USE OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 7, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 17, 2026
    Permit
    Sidewalk Shed · Installation of temporary construction fence, heavy duty sidewalk shed, and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 17, 2026
    Permit
    Supported Scaffold · Installation of temporary construction fence, heavy duty sidewalk shed, and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 16, 2026
    Permit
    Mechanical Systems · REPLACMENT OF TWO ROOFTOP CONDENSING UNITS WITH A TOTAL CAPACITY OF 10 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 15, 2026
    Permit
    Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD AT 1610 MATTHEWS AVENUE BRONX, NY AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 15, 2026
    Permit
    Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD AT 1649 BRONXDALE AVENUE BRONX, NY AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)