Sprinklers · FILING HEREWTITH DRY SPRINKLER SYSTEM AND MODIFICATIONS TO EXISTING WET SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Sprinklers · PLUMBING: Remove 1 sink. New Fixtures: Sink: 16 Water Closet: 5 Lavatory: 5 Water Heater: 1 (40 gal, 32 GPH). SP: INSTALLATION OF 87 NEW SPRINKLER HEADS TO THE EXISTING SYSTEM
No product keyword matched · NYC DOB building permits
General Construction · Install of temp tents, platforms and prod equip., no alt to exist structures for Seasonal HOY Concert Series. TPAs required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
No product keyword matched · NYC DOB building permits
Sprinklers · PLUMBING: Remove 1 sink. New Fixtures: Sink: 16 Water Closet: 5 Lavatory: 5 Water Heater: 1 (40 gal, 32 GPH). SP: INSTALLATION OF 87 NEW SPRINKLER HEADS TO THE EXISTING SYSTEM
No product keyword matched · NYC DOB building permits
General Construction · Install of temp viewing platform, no alt to exist structures for Agape Fest. TPA required. Producer is responsible to monitor site safety. All production equipment removed upon event completion
No product keyword matched · NYC DOB building permits
General Construction · Install of temp tents, no alt to exist structures for Beanstalk. TPA's filed as req'd. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete.
No product keyword matched · NYC DOB building permits
General Construction · Renovation of existing business occupancy into medical office space, including 15 exam rooms, waiting area associated support spaces. No change to use, egress or occupancy
No product keyword matched · NYC DOB building permits
Mechanical Systems · demolition of existing ductwork distribution&associated components&steam radiators. Existing AHU to be reused w/new ductwork distribution to align w new layout&new steam radiators. A new supplemental ceiling mounted unit is being provided
No product keyword matched · NYC DOB building permits
Sprinklers · ALTERATION OF EXISTING SPRINKLER SYSTEM INCLUDING THE RELOCATION & REPLACEMENT OF SPRINKLER HEADS ALONG WITH THE REMOVAL OF THE EXISTING PRE-ACTION SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
No product keyword matched · NYC DOB building permits
General Construction · Install of temp tents, platforms and prod equip., no alt to exist structures for IC Annual Work Permit. TPAs filed as required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete.
No product keyword matched · NYC DOB building permits
General Construction · 2ND FLOOR OFFICES INTERIOR RENOVATION - GENERAL CONSTRUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Mechanical Systems · 2ND FLOOR - OFFICES INTERIOR RENOVATION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits