Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/THE CATHEDRAL CHURCH OF ST. JOHN TH
Back to prospects

THE CATHEDRAL CHURCH OF ST. JOHN TH

Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 9 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness3 / 5Latest signal is within 180 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
THE CATHEDRAL CHURCH OF ST. JOHN TH
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Aug 7, 2026
Source for Signal date (opens in new tab)
Signal count
3 saved signals, 0 in the last 90 days
Signal summary
General Construction · HEREWITH FILE TO RENOVATE EXISTING CHURCH (SYNOD HOUSE). WORK INCLUDES NEW ADA COMPLIANCE RESTROOM, NEW NON-LOAD BEARING WALL, AND NEW FLOOR COVERING, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Source for Signal summary (opens in new tab)
Address
161 E 109TH STREET
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

3 signals
  • Aug 7, 2026
    Permit
    General Construction · HEREWITH FILE TO RENOVATE EXISTING CHURCH (SYNOD HOUSE). WORK INCLUDES NEW ADA COMPLIANCE RESTROOM, NEW NON-LOAD BEARING WALL, AND NEW FLOOR COVERING, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 7, 2026
    Permit
    Plumbing · HEREWITH FILE TO INSTALL NEW ADA COMPLIANCE RESTROOM IN EXISTING CHURCH (SYNOD HOUSE). WORK INCLUDES NEW PLUMBING FIXTURE WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 24, 2026
    Permit
    Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)