Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/PALONE BROTHERS AIR
Back to prospects

PALONE BROTHERS AIR

Manhattan, Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 10 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
PALONE BROTHERS AIR
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Sep 10, 2026
Source for Signal date (opens in new tab)
Signal count
6 saved signals, 1 in the last 90 days
Signal summary
Mechanical Systems · Propose to perform mechanical work. No change in use, egress or occupancy.
Source for Signal summary (opens in new tab)
Address
100-24 AVENUE D
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

6 signals
  • Sep 10, 2026
    Permit
    Mechanical Systems · Propose to perform mechanical work. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 23, 2026
    Permit
    Mechanical Systems · Replace exiting HVAC Unit on exiting dunnage at roof, install air handler at basement. No change to use egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 14, 2026
    Permit
    Mechanical Systems · Preplacement of 1 existing nominal 19000 BTU water-sourced heat pump unit in a single-family simple residence with 2 new 10000 BTU units. Replacements include modification to the existing condenser water run-out piping to serve both units.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 6, 2026
    Permit
    Mechanical Systems · INTERIOR MODIFICATIONS IN SUITE 501 ON THE AND THE BATHROOM ON THE 5TH FLOOR. INCLUDES REMOVAL OF SELECT EXISTING DUCTWORK AND MECHANICAL COMPONENTS, INSTALLATION OF NEW SPLIT SYSTEM AIR COOLED AIR CONDITIONING UNIT..
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 26, 2026
    Permit
    Mechanical Systems · Interior mechanical renovation of existing commercial unit on the 14th Floor as per plans. No change to use, occupancy, or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 28, 2025
    Permit
    Mechanical Systems · Propose to perform mechanical work. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)