Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/SUTTON MANAGEMENT CORP.
Back to prospects

SUTTON MANAGEMENT CORP.

Brooklyn, Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
SUTTON MANAGEMENT CORP.
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 21, 2026
Source for Signal date (opens in new tab)
Signal count
9 saved signals, 3 in the last 90 days
Signal summary
Mechanical Systems · DIRECT REPLACEMENT OF (1) ROOF TOP UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Source for Signal summary (opens in new tab)
Address
169 OAKDENE AVE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

9 signals
  • Oct 21, 2026
    Permit
    Mechanical Systems · DIRECT REPLACEMENT OF (1) ROOF TOP UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 9, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    Supported Scaffold · INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 11, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 5, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF TEMPORARY BARRICADE FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 14, 2026
    Permit
    General Construction · FACADE REPAIRS AND EMERGENCY FACADE STABLIZATION AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 6, 2026
    Permit
    Protection and Mechanical Methods · STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 6, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF 500 LBS CAPACITY ELECTRIC MATERIAL ONLY HOISTS DURING BLDG ALTERATION, FILED SEPARATELY. HOISTS SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 28, 2025
    Permit
    General Construction · FACADE REPAIRS AND EMERGENCY FACADE STABLIZATION AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)