Plumbing · Remove/cap in cellar existing hot water heater with related gas piping and gas meter and installing new water sanitary piping to new electric heat pump water heater as per plans filed herewith.
Plumbing · Remove/cap in cellar existing hot water heater with related gas piping and gas meter and installing new water sanitary piping to new electric heat pump water heater as per plans filed herewith.
No product keyword matched · NYC DOB building permits
General Construction · Replacement of personnel doors and the upgrade of overhead garage door controls and the replacement and installation of new windows in designated areas as per plans filed herewith.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Installation of new chillers, air handlers, and associated ductwork and piping at 59-06 Laurel Hill Blvd. as per plans filed herewith.
No product keyword matched · NYC DOB building permits
Mechanical Systems · THE REMOVAL OF EXISTING AIR TERMINALS AND DUCTWORK. THE REPLACEMENT OF EXISTING ROOFTOP AIR HANDLERS, EXHAUST AIR UNIT, AND ASSOCIATED DUCTWORK, PIPING, CONTROLS AND ACCESSORIES.3. THE REPLACEMENT OF EXISTING FIN TUBE RADIATORS AND ASSOCIATED PIPING.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · PROPOSED INSTALLATION OF NEW TEMPORARY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Boiler Equipment · Removal of two existing gas boilers with related oil piping and install three gas fired condensing boilers in the cellar as per plans filed herewith.
No product keyword matched · NYC DOB building permits
Plumbing · Removal of gas piping, pilot light and gas meter, installing new gas piping to three new gas fired condensing boilers as per plans filed herewith.
No product keyword matched · NYC DOB building permits
Mechanical Systems · HVAC VRF Heat pump system and ventilation system installation at cellar through 4th floor occupied areas. No change in use, egress & occupancy with this application.
No product keyword matched · NYC DOB building permits
General Construction · Demolition of existing partitions and plumbing fixtures. Installation of new partitions, doors and plumbing fixtures, Demolition, relocation and installation of new lighting fixtures.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · PROPOSED INSTALLATION OF NEW TEMPORARY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
General Construction · Demolition of existing partitions and plumbing fixtures. Installation of new partitions, doors and plumbing fixtures, Demolition, relocation and installation of new lighting fixtures.
No product keyword matched · NYC DOB building permits
Mechanical Systems · HVAC VRF Heat pump system and ventilation system installation at cellar through 4th floor occupied areas. No change in use, egress & occupancy with this application.
No product keyword matched · NYC DOB building permits
Plumbing · CELLAR THROUGH FORTH FLOOR INSTALLATION OF A NEW SLOP SINK AND BOTTLE FILLING STATION AS PER PLAN. SECOND FLOOR; DEMOLITION OF AN EXISTING LAVATORY, INSTALLATION OF A NEW URINAL, NEW PRIVATE BATHROOM AS PER PLAN.
No product keyword matched · NYC DOB building permits
Supported Scaffold · Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched · NYC DOB building permits
Plumbing · EXISTING HVAC UNITS GAS LINE DISCONNECT AND BRANCE PIPING REPLACEMENT AND RECONNECT GAS LINE WITH NEW HVAC UNIS IN ROOF AREA BUILDING A, B AND C.
No product keyword matched · NYC DOB building permits