Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR RENOVATION AT APT 19FG ON THE 19TH FLOOR, AS PER PLANS FILED HEREWITH. TO SUPERSEDE BIS JOB 102670539. SCOPE OF WORK INCLUDES INTERIOR WALLS SCRAPED, PLASTERED, SANDED AND PAINTED, FLOOR REPLACED. NO CHANGE TO LAYOUT, EGRESS, USE, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Suspended Scaffold · Installation of suspended scaffold for facade work and/or inspection. Amend #1, added winsafe 1500 back plate and scaffold anchor detail
No product keyword matched · NYC DOB building permits