Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
No product keyword matched · NYC DOB building permits
Suspended Scaffold · INSTALLATION OF TEMPORARY MULTIPOINT-SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF BETA MAX MATERIAL HOIST AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING NB CONSTRUCTION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
No product keyword matched · NYC DOB building permits
Sprinklers · Sprinkler work includes removal of 34 upright heads, with 9 existing upright heads to remain, and 24 new pendant style heads to be installed from existing branch lines
No product keyword matched · NYC DOB building permits
Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · EQUIPMENT USE: DUAL #7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
No product keyword matched · NYC DOB building permits