Foundation · CONSTRUCTION OF RETAINING WALL ALONG THE PROPOSED RIGHT-OF-WAY OF FRONT STREET. THEWALL IS DESIGNED AS A SOLDIER PILE WALL WITH A CAST-IN-PLACE REINFORCED CONCRETE WALL. THE WALL IS DESIGNED TORETAIN THE ADJACENT SLOPED EMBANKMENT ADJACENT TO THE R.O.W.
Foundation · CONSTRUCTION OF RETAINING WALL ALONG THE PROPOSED RIGHT-OF-WAY OF FRONT STREET. THEWALL IS DESIGNED AS A SOLDIER PILE WALL WITH A CAST-IN-PLACE REINFORCED CONCRETE WALL. THE WALL IS DESIGNED TORETAIN THE ADJACENT SLOPED EMBANKMENT ADJACENT TO THE R.O.W.
No product keyword matched · NYC DOB building permits