Mechanical Systems · Replacement of (2) air conditioning units on the roof. All existing ductwork to remain as is. No change in use egress and occupancy.
Mechanical Systems · Replacement of (2) air conditioning units on the roof. All existing ductwork to remain as is. No change in use egress and occupancy.
No product keyword matched · NYC DOB building permits
Sprinklers · PROVIDE SPRINKLER COVERAGE PER NFPA 13-2016 & NYC APPENDIX Q. DEMO EXISTING SPRINKLER HEADS/BRANCH PIPING ON 4TH FL. NEW SPRINKLER BRANCH PIPING & SPRINKLER HEADS. PLUMBING SCOPE FOR DOMESTIC/SANITARY/VENT PIPING SYSTEMS AT 4TH FL. NO CHANGE TO USE EGRESS
No product keyword matched · NYC DOB building permits
Plumbing · PROVIDE SPRINKLER COVERAGE PER NFPA 13-2016 & NYC APPENDIX Q. DEMO EXISTING SPRINKLER HEADS/BRANCH PIPING ON 4TH FL. NEW SPRINKLER BRANCH PIPING & SPRINKLER HEADS. PLUMBING SCOPE FOR DOMESTIC/SANITARY/VENT PIPING SYSTEMS AT 4TH FL. NO CHANGE TO USE EGRESS
No product keyword matched · NYC DOB building permits
General Construction · ALTERATION TYPE 2 TO EXISTING 9 STORY COMMERCIAL BUILDING , TO ALTER INTERIOR LAYOUT OF BUSINESS OFFICES AT THE 4TH FLOOR ONLY AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO USE OCCUPANCY OR EGRESS.
No product keyword matched · NYC DOB building permits
Mechanical Systems · NEW VENTILATION AIR DISTRIBUTION SYSTEM INCLUDING DUCT AND MECHANICAL WORK CONNECTED TO EXISTING BUILDING RISERS.NEW RETURN AIR SYSTEM FOR BUILDING AHU VENTILATION VIA GRID CEILING RETURN GRILLES. NEW EXHAUST FANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
General Construction · THIS PROJECT IS A CONNECTION OF TWO EXISTING ONE STORY SPACES INTO ABREEZEWAY THAT CONNECTS THE TWO STORIES. THIS SCOPE INCLUDES NEWCONSTRUCTION OF A STAIR AND ELEVATOR, NEW FACADE WORK ON BOTH SECONDAND FIRST FLOORS, AND NEW BREEZEWAY ACCESS.
No product keyword matched · NYC DOB building permits
Structural · NEW ELEVATOR AND MODIFICATIONS ON EXISTING 2ND FLOOR STRUCTURAL STEEL FRAMING. NEW ELEVATOR OPENING ON EXISTING 2ND FLOOR LEVEL. NEW BEAM INSTALLATIONS ANDSTRUCTURAL REINFORCEMENTS ON EXISTING STEEL BEAMS.
No product keyword matched · NYC DOB building permits
Mechanical Systems · MECHANICAL SCOPE OF WORK INCLUDES THE REMOVAL OF (1) ROOF TOP UNIT, PARTIAL REMOVALOF EXISTING AIR DUCTS, AND THE INSTALLATION OF (2) NEW ROOFTOP UNITS.
No product keyword matched · NYC DOB building permits
Structural · INTERIOR RENOVATION OF AN EXISTING 2,622 SQFT SPACE. SCOPE INCLUDES THE PARTIALREMOVAL OF EXISTING STOREFRONT WINDOWS AND REPLACED WITH NEW ALONG ENTRY/EXITDOORS. STRUCTURAL SCOPE OF WORK INCLUDES THE INSTALLATION OF STRUCTURE SUPPORTS FOR NEWHVAC OPENING
No product keyword matched · NYC DOB building permits
Plumbing · PLUMBING SCOPE INCLUDES MODIFICATION TO EXISTING DOMESTIC WATER METER INDEPENDENT FOR TENANT USE AND SANITARY VENT. NEW MODIFICATIONS TO EXISTING GAS METER.
No product keyword matched · NYC DOB building permits
General Construction · 9045-Interior renovation of existing retail space. Partial replacement of floor covering and relocating sales area and millwork and floor fixtures. No change in egress Occupancy or Usegroup. Professional certification requested.
No product keyword matched · NYC DOB building permits
Standpipe · Install new manual wet standpipe system, including piping, roof manifold, hose valves, FDC, backflow preventer, and connection to existing water service, as shown on plans. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits