Earth Work · Foundation work consists of a new retaining wall and slab-on-grade in the rear yard. No foundation work inside the building. No change to use, egress, or occupancy.
Earth Work · Foundation work consists of a new retaining wall and slab-on-grade in the rear yard. No foundation work inside the building. No change to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · This Alteration application is being filed for exterior & interior renovation of existing 1 family residence. In conjunction with Sprinkler #B01025309, plumbing #B01024282, Mechanical #B01024259 apps. There are no change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · GENERAL CONSTRUCTION RELATED TO INTERIOR RENOVATIONS OF AN EXISTING APARTMENT UNIT AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Mechanical Systems · RENOVATION OF APARTMENT 2L ON SECOND FLOOR, REFURBISH BATHROOMS, RELOCATE KITCHEN, NEW FINISHES AND MILLWORK. INSTALL NEW SPLIT-SYSTEM HEAT PUMP FOR HEATING, COOLING AND VENTILATION. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
No product keyword matched · NYC DOB building permits
General Construction · Interior and exterior renovation of one family townhouse, including the removal of the existing fire escape as approved under PDA00012744 and having a partially open stair as approved under PDA00012534. No change to use, egress,
No product keyword matched · NYC DOB building permits
Mechanical Systems · Mechanical work associated with the townhouse renovation, as shown on plans filed herewith. no change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Structural · Removal of bearing wall at the 3rd floor and reinforcing of existing framing at 2nd and 3rd floor bathrooms. No change in Building height, Floor Area, Bulk, Egress, Occupancy, or Use under this application. Filed in conjunction with GC job# B01354719-I1.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR RENOVATIONS TO CELLAR, 2ND, AND 3RD FLOORS OF AN EXISTING 2-FAMILY ROW HOUSE. PARTITION WORK AND INSTALLATION OF NEW FINISHES AND MILLWORK IN AREAS OF WORK. PLUMBING, MECHANICAL, AND STRUCTURAL WORK TO BE FILED UNDER SEPARATE APPLICATIONS.
No product keyword matched · NYC DOB building permits
Structural · structural work including superstructure work, new steel moment frame at rear, and new framing to support skylight at roof as shown on plans filed herewith. All interior framing to remain unchanged No change to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
Structural · structural work including superstructure work, new steel moment frame at rear, and new framing to support skylight at roof as shown on plans filed herewith. All interior framing to remain unchanged No change to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR RENOVATIONS TO CELLAR, 2ND, AND 3RD FLOORS OF AN EXISTING 2-FAMILY ROW HOUSE. PARTITION WORK AND INSTALLATION OF NEW FINISHES AND MILLWORK IN AREAS OF WORK. PLUMBING, MECHANICAL, AND STRUCTURAL WORK TO BE FILED UNDER SEPARATE APPLICATIONS.
No product keyword matched · NYC DOB building permits
Structural · Removal of bearing wall at the 3rd floor and reinforcing of existing framing at 2nd and 3rd floor bathrooms. No change in Building height, Floor Area, Bulk, Egress, Occupancy, or Use under this application. Filed in conjunction with GC job# B01354719-I1.
No product keyword matched · NYC DOB building permits
General Construction · Interior and exterior renovation of one family townhouse, including the removal of the existing fire escape as approved under PDA00012744 and having a partially open stair as approved under PDA00012534. No change to use, egress,
No product keyword matched · NYC DOB building permits
Mechanical Systems · Mechanical work associated with the townhouse renovation, as shown on plans filed herewith. no change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Includes the installation of a new VRF system to provide heating and cooling to the spaces. A new DOAS is installed to provide both ventilation and exhaust to the spaces. Supplemental electric heat is provided at perimeter rooms.