Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/OPUS INTERIORS LLC
Back to prospects

OPUS INTERIORS LLC

Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
OPUS INTERIORS LLC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 19, 2026
Source for Signal date (opens in new tab)
Signal count
11 saved signals, 1 in the last 90 days
Signal summary
Sprinklers · Relocate and install sprinkler heads on the cellar level, 1st floor through 5th floor, and penthouse as per plans submitted herewith. There are no change to use, egress or occupancy.
Source for Signal summary (opens in new tab)
Address
365 VAN BRUNT STREET
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

11 signals
  • Oct 19, 2026
    Permit
    Sprinklers · Relocate and install sprinkler heads on the cellar level, 1st floor through 5th floor, and penthouse as per plans submitted herewith. There are no change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 27, 2026
    Permit
    Boiler Equipment · INSTALLATION OF BOILER AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 23, 2026
    Permit
    Mechanical Systems · INSTALLATION OF A NEW HVAC SYSTEM SERVING THE MECHANICAL NEEDS OF THE PROPERTY IN CONJUNCTION WITH THE GC APPLICATION.SYSTEMS INCLUDE COOLING, HEATING, VENTILATION, KITCHEN EXHAUST, MAKE UP AIR, POST FIRE SMOKE PURGE, HUMIDIFICATION AND ASSOCIATED SYSTEMS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 30, 2026
    Permit
    Plumbing · Installation of a combined fire protection water service with domestic water takeoff, new sanitary, vent, domestic water, stormwater, and gas pipping appliances. No change to use, egress or occupancy under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 30, 2026
    Permit
    Sprinklers · Relocate and install sprinkler heads on the cellar level, 1st floor through 5th floor, and penthouse as per plans submitted herewith. There are no change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 4, 2026
    Permit
    Foundation · Filing for concrete used for underpinning for the construction of a new elevator in cellar. No change to use egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 4, 2026
    Permit
    Foundation · Underpinning for the construction of a new elevator in cellar. No change to use egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 28, 2026
    Permit
    Support of Excavation · THE SUPPORT OF EXCAVATION (SOE) FOR THE CONSTRUCTION OF A NEW ELEVATOR IN THE EXISTING CELLAR, INCLUDING SAFE SLOPING AND TIMBER SHORING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 22, 2025
    Permit
    Foundation · New foundation for elevator pit in cellar. No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 28, 2025
    Permit
    Structural · Installation of structural steel to support existing floor joists throughout structure and related steel work on cellar level, 001 thru 005, penthouse and roof. No change to use, egress or occupancy under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 24, 2025
    Permit
    General Construction · INTERIOR DEMOLITION OF EXISTING STAIR, DEMISING WALLS & ELEVATOR SHAFT. CONSTRUCTION OF NEW STAIR & RATED PARTITIONS AND ELEVATOR SHAFT. CHANGE USE TO SINGLE TENNANT ALL COMMERCIAL. OBTAIN NEW C OF O.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)