Plumbing · REPLACE GAS PIPING FROM THE LADWIG VALVE TO THE (NEW) REPLACED BOILER 3 (B3). BOILER WORK TYPE FOR B3 WAS FILED UNDER JOB # M01206858-I1. NO CHANGE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Plumbing · REPLACE GAS PIPING FROM THE LADWIG VALVE TO THE (NEW) REPLACED BOILER 3 (B3). BOILER WORK TYPE FOR B3 WAS FILED UNDER JOB # M01206858-I1. NO CHANGE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Boiler Equipment · REPLACE AERCO GAS FIRED BOILER 3 WITH LAARS 2000 GAS FIRED BOILER. BOTH BOILERS HAVE THE SAME HEAT INPUT OF 2MMBTU/HR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits