Sprinklers · INSTALLATION OF A TEMPORARY DRY SPRINKLER LOOP ON THE CELLAR AND SUB-CELLAR LEVEL AT MSKCC PHASE 2, AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
No product keyword matched · NYC DOB building permits
Sprinklers · Hereby filing to remove and install sprinkler heads with related piping as shown on plans filed herewith. No change to use, occupancy or egress.
No product keyword matched · NYC DOB building permits
Sprinklers · modifications to existing sprinkler system as per plans WORK ASSOCIATED WITH THE BUILDOUT OF CELLAR LEVELMECHANICAL ROOMS filed herewith. No change in use, egress or occupancy under this application
No product keyword matched · NYC DOB building permits
Sprinklers · INSTALLATION OF A SPRINKLER SYSTEM ON THE 1ST FLOOR AT WELLS FARGO BRANCH AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
No product keyword matched · NYC DOB building permits
Standpipe · As per HUB consultation. Installation and removal of sprinkler heads and associated piping. Installation of one auxiliary standpipe per floor as per plans filed herewith.
No product keyword matched · NYC DOB building permits
Sprinklers · As per HUB consultation. Installation and removal of sprinkler heads and associated piping. Installation of one auxiliary standpipe per floor as per plans filed herewith.
No product keyword matched · NYC DOB building permits
Sprinklers · Modification/additions to existing sprinkler system for Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration as per plans filed herewith. No change in use, egress or occupancy under this application.
No product keyword matched · NYC DOB building permits
Sprinklers · Modifying heads to accommodate the new separation wall between buildings. Creating a new bypass loop at the location of the building separation on the 2nd Floor. Connecting the existing sprinkler layout in the south portion of 663 Fifth to the
No product keyword matched · NYC DOB building permits
Sprinklers · BELLEVUE HOSPITAL IS FITTING OUT AN EXISTING 9TH FLOOR LAB AS NEW IT/MDF ROOM. ROOM WILL BE PROTECTED WITH A DEDICATED SINGLE INTERLOCKED ELECTRONIC ACTUATED SPRINKLER SYSTEM, WITH A DEDICATED NOVAC 1230 CLEAN AGENT SYSTEMFOR THE IT/MDF SPACE ONLY..
No product keyword matched · NYC DOB building permits
Standpipe · BELLEVUE HOSPITAL IS FITTING OUT AN EXISTING 9TH FLOOR LAB AS NEW IT/MDF ROOM. ROOM WILL BE PROTECTED WITH A DEDICATED SINGLE INTERLOCKED ELECTRONIC ACTUATED SPRINKLER SYSTEM, WITH A DEDICATED NOVAC 1230 CLEAN AGENT SYSTEMFOR THE IT/MDF SPACE ONLY..
No product keyword matched · NYC DOB building permits
Standpipe · INSTALLATION OF A TEMPORARY AIR-PRESSURIZED STANDPIPE SYSTEM AT THE COLUMBIA UNIVERSITY - BERRIE MEDICAL SCIENCE EXPANSION AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
No product keyword matched · NYC DOB building permits