Plumbing · RELOCATION OF TOILETS, SHOWERS AND LAVATORIES IN BATHS,KITCHEN SINK, INSTALLATION OF WASHER AND DISHWASHER. INST OF TOILET AND LAVATORY AND SINK IN ROOF TERRACEE BAR. NEW WATER LINE FOR WATER FIXTURE. NO CHANGE OF USE,EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Plumbing · RENOVATION TO PLUMBING SYSTEM RELATED TO APARTMENT RENOVATION OF UNITS 603 (6TH FLOOR), 1301 (13TH FLOOR) AND 1401 (14TH FLOOR). REPLACEMENT, NEW INSTALLATION AND RELOCATION OF SEVERAL PLUMBING FIXTURES. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Plumbing · PLUMBING SCOPE OF WORK RELATED TO THE CHANGE OF USE OF 2ND TO 4TH FLOORS FROM OFFICE TO RESIDENTIAL. INSTALL (9) NEW SHOWERS, (3) NEW KITCHEN SINKS, (3) NEW DISHWASHERS, (3) NEW WASHERS.
No product keyword matched · NYC DOB building permits
Plumbing · INSTALL NEW GAS METER ON EXISTING METER BAR INTHE CELLAR. INSTALL NEW GAS SHUT OFF VALVE , INSTALL 4 NEW COOKING EQUIPMENT,. REPLACE 3 COMPARTMENT SINK AND HW SINK IN KITCHEN. INSTALL NEW HW SUPPLY AND DRAIN TO STEAM TABLE IN RESTAURANT.
No product keyword matched · NYC DOB building permits
Plumbing · PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B)
No product keyword matched · NYC DOB building permits
Plumbing · INTERIOR RENOVATION OF APT #4E PER PLANS FILED HEREWITH. WORK INCLUDES REMOVAL AND REPLACEMENT OF EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Plumbing · PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B)
No product keyword matched · NYC DOB building permits