General Construction · Target: Interior modifications to convert the former CVS space into accessory storage as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01425907-I1 (MS)
No product keyword matched · NYC DOB building permits
Mechanical Systems · Target: Modifications to the Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01411084 (GC).
No product keyword matched · NYC DOB building permits
Mechanical Systems · Installation of SCAV HVAC systems with electric heating coils and fully ducted distribution to serve the proposed architectural build-out for commercial tenant space including condensate disposal systems and automatic temperature controls, shown in plans.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Replacement of existing rooftop unit(s) with new unit(s). No modification to existing interior ductwork, registers, or diffusers. No change in occupancy, use, or egress.
No product keyword matched · NYC DOB building permits
Sprinklers · MAINTAIN EXISTING TEMPORARY LOOP DURING CONSTRUCTION OF THE TENANT FITOUT. NEW FULL SPRINKLER SYSTEM THROUGHOUT SPACE TIED IN TO EXISTING SPRINKLER MAIN. NEW SPRINKLER SYSTEM SHALL CONSIST OF NEW PIPE, VALVES, SPRINKLER HEADS AS SHOWN ON THESE DOCUMENTS
No product keyword matched · NYC DOB building permits
General Construction · EXTERIOR WORK WILL BE LIMITED TO PAINT. TENANT BUILD OUT FOR A NEW FINE/FAST-CASUAL RESTAURANT WITH DINE-IN AND TAKE-AWAY SERVICES INCLUDING DEMOLITION AND GENERAL CONSTRUCTION WORK OF INTERIOR WALLS AND FINISHES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS
No product keyword matched · NYC DOB building permits
General Construction · HEREWITH FILED ALTERATION FOR THE INTERIOR RENOVATION OF THE CELLAR, FIRST AND SECOND FLOORS OF THE EXISTING COMMERCIAL BUILDING AND OBTAIN A LETTER OF COMPLETION FOR SAME. NO CHANGE IN USE, EGRESS OR OCCUPANCY
No product keyword matched · NYC DOB building permits