General Construction · combine suites 1401 with 1403 on 14th fl. Non bearing partitions and finishes removal. New partitions and finishes. No change in use, egress or occupancy
General Construction · combine suites 1401 with 1403 on 14th fl. Non bearing partitions and finishes removal. New partitions and finishes. No change in use, egress or occupancy
No product keyword matched · NYC DOB building permits
Plumbing · Installation of rough plumbing and fixtures at 17th floor, including (1) pantry sink, (1) ejector pump, (1) dishwasher with indirect waste and vacuum breaker, (1) ice maker
No product keyword matched · NYC DOB building permits
General Construction · Interior demolition of exist non-bearing partitions. Installation of new non-bearing gyp. bd. partitions, doors, frames and finishes. No change in use, occupancy or egress.
No product keyword matched · NYC DOB building permits
Plumbing · Installation of rough plumbing and fixtures at 17th floor (Suite C), including (1) pantry sink, (1) dishwasher with indirect waste and vacuum breaker, (1) ice maker
No product keyword matched · NYC DOB building permits
General Construction · renovate suite # 1305 on 13th fl. Non baring partitions removal, new partitions and finishes. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits