General Construction · Minor modification of interior space to include installation of three (3) dry Saunas, and three (3) cold tubs for use by proposed recovery center. No change in use or occupancy or means of egress
General Construction · Minor modification of interior space to include installation of three (3) dry Saunas, and three (3) cold tubs for use by proposed recovery center. No change in use or occupancy or means of egress
No product keyword matched · NYC DOB building permits
General Construction · Minor interior modifications to install two (2) dry saunas and four (4) cold tubs for the recovery center. No change in use (Community Facility IIIB), means of egress, or occupancy, which will remain classified as Group B.
No product keyword matched · NYC DOB building permits
Plumbing · New Installation of one (1) floor drain , one (1) trench drain, two (2) shower heads, one (1) submersible sump pump to be connected to existing system. No change in use or egress.
No product keyword matched · NYC DOB building permits