Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/MORELAND CONSTRUCTION GR*
Back to prospects

MORELAND CONSTRUCTION GR*

Staten Island, Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 9 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness3 / 5Latest signal is within 180 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
MORELAND CONSTRUCTION GR*
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Jul 22, 2026
Source for Signal date (opens in new tab)
Signal count
6 saved signals, 0 in the last 90 days
Signal summary
General Construction · HERE, FILLING THE G.C. APPL. TO LEGALIZED CONC. DECK TO SATISFY RCA #5196572. NO CHANGE TO EXISTING USE, EGRESS, OCCUPANCY, PARKING, ENERGY EFFICIENCY, ACCESSIBILITY OR FIRE RESISTANCE RATINGS PROPOSED UNDER THIS APPLICATION.
Source for Signal summary (opens in new tab)
Address
45 MAIN STREET, SUITE #707
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

6 signals
  • Jul 22, 2026
    Permit
    General Construction · HERE, FILLING THE G.C. APPL. TO LEGALIZED CONC. DECK TO SATISFY RCA #5196572. NO CHANGE TO EXISTING USE, EGRESS, OCCUPANCY, PARKING, ENERGY EFFICIENCY, ACCESSIBILITY OR FIRE RESISTANCE RATINGS PROPOSED UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 22, 2026
    Permit
    General Construction · HERE, FILLING THE G.C. APPL. TO REMOVE FRONT-YARD PAVERS TO SATISFY RCA #5196572. NO CHANGE TO EXISTING USE, EGRESS, OCCUPANCY, PARKING, ENERGY EFFICIENCY, ACCESSIBILITY OR FIRE RESISTANCE RATINGS PROPOSED UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 19, 2026
    Permit
    Structural · Installation of new structural steel members due to the removal of the convenience stair between the 5th and 6th floors, and add new slab fill at the 5th and 6th floors as per plans. NO CHANGE IN USE, OCCUPANCY OR EGRESS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 7, 2026
    Permit
    General Construction · Removal of existing convenience stair between the 5th and 6th floors, removal of associated walls and platform, and add new slab infill at the 6th floor as per plans. NO CHANGE IN USE, OCCUPANCY OR EGRESS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 16, 2026
    Permit
    Mechanical Systems · PRE-TENANT WORK-- MECHANICAL MODIFICATIONS IN CONJUNCTION WITH DEMO AND BATHROOM FITOUT.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 13, 2026
    Permit
    General Construction · PRE-TENANT WORK 27-29-- INTERIOR DEMOLITION AND CONSTRUCTION REQUIRED FOR BATHROOM FITOUT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)