Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/DAFFODIL GENERAL CONTRACTING INC
Back to prospects

DAFFODIL GENERAL CONTRACTING INC

Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 10 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
DAFFODIL GENERAL CONTRACTING INC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Sep 24, 2026
Source for Signal date (opens in new tab)
Signal count
12 saved signals, 3 in the last 90 days
Signal summary
General Construction · APP TO RPR. MIN. CRACKS & PERF. FACE BRK. REPOINTING. & PAINT @ EXIST. FRONT FACADE OF BLDG. EXTERIOR FINISH IN ACCORDANCE WITH LPC REQUIREMENTS AND HISTORIC DISTRICT AESTHETIC STANDARDS .NO CHANGE IN USE,EGRESS, OR OCCUPANCY.
Source for Signal summary (opens in new tab)
Address
1039A PACIFIC STREET
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

12 signals
  • Sep 24, 2026
    Permit
    General Construction · APP TO RPR. MIN. CRACKS & PERF. FACE BRK. REPOINTING. & PAINT @ EXIST. FRONT FACADE OF BLDG. EXTERIOR FINISH IN ACCORDANCE WITH LPC REQUIREMENTS AND HISTORIC DISTRICT AESTHETIC STANDARDS .NO CHANGE IN USE,EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR EXTERIOR FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 8, 2026
    Permit
    Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 30, 2026
    Permit
    Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 26, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF HEAVYDUTY SIDEWALK SHED FOR EXTERIOR FACADE REPAIS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 26, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF HEAVYDUTY SIDEWALK SHED FOR EXTERIOR FACADE REPAIS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 1, 2026
    Permit
    Supported Scaffold · INSTALL TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. PIPE SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 1, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 1, 2026
    Permit
    General Construction · APPLICATION TO REPAIR BROWN STONE/SPOTPOINTING ON FACADE, WINDOWS CAULKING AND PAINT ALSO ENTIRE FRONT POWER WASH ASPER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 13, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 13, 2026
    Permit
    Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)