Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/CB DEVELOPERS
Back to prospects

CB DEVELOPERS

Manhattan, MANHATTAN, Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
CB DEVELOPERS
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 5, 2026
Source for Signal date (opens in new tab)
Signal count
18 saved signals, 2 in the last 90 days
Signal summary
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Source for Signal summary (opens in new tab)
Address
20 BURLING LANE (BOX 4-1)
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

18 signals
  • Nov 5, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 2, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF DUAL PERSONNEL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BULIDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 24, 2026
    Permit
    Suspended Scaffold · TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST. FILED SEP. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 3, 2026
    Permit
    General Construction · Interior renovation of the 1st FL Lobby area, no change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 18, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 29, 2026
    Permit
    Suspended Scaffold · TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST. FILED SEP. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 29, 2026
    Permit
    Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 26, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 19, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 12, 2026
    Permit
    General Construction · APPLICATION FILED HEREWITH FOR A TEMPORARY CONSTRUCTION OFFICE. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 28, 2026
    Permit
    Mechanical Systems · Modification of exhaust ducts in the kitchen. No change in egress, occupancy, or use under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 27, 2026
    Permit
    General Construction · Interior renovation of the existing restaurant: installation of non-load-bearing partitions and cosmetic finishes for the floor, walls, & ceiling. No change in egress, occupancy, or use under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 23, 2026
    Permit
    Plumbing · Installation of plumbing fixtures on 1st floor: 6 cooking equipment, 1 shut-off valve, 11 sanitary/water plumbing fixtures. No change in egress, occupancy, or use under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 22, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 16, 2026
    Permit
    Sprinklers · Relocation of four(4) existing sprinkler heads. No change in egress, occupancy, or use under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 15, 2025
    Permit
    Mechanical Systems · Propose mechanical work at at partial 1st FL (#1228A) commercial space of existing mixed-use building as per plan. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 18, 2025
    Permit
    Protection and Mechanical Methods · PLACEMENT AND USAGE OF MOBILE MINI CRANE (ONE LOCATION AT A TIME) DURING NB CONSTRUCTION (DOB NOW # M00951363) AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH BC 2022. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS FILING.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)