Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/BARNARD COLLEGE - COLUMBIA UNIVERSI
Back to prospects

BARNARD COLLEGE - COLUMBIA UNIVERSI

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
BARNARD COLLEGE - COLUMBIA UNIVERSI
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 5, 2026
Source for Signal date (opens in new tab)
Signal count
40 saved signals, 8 in the last 90 days
Signal summary
Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
Source for Signal summary (opens in new tab)
Address
231 NORMAN AVENUE, SUITE 206
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

40 signals
  • Nov 5, 2026
    Permit
    Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    Mechanical Systems · Application filed for mechanical modificatins as per plans. No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    General Construction · APPLICATION FILED FOR GENERAL CONSTRUCTION WORK TO SUPPORT ALL MEP/BOILER EQUIPMENT AND SERVICES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 16, 2026
    Permit
    General Construction · EXTERIOR FACADE REPAIRS ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 4, 2026
    Permit
    Supported Scaffold · installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 4, 2026
    Permit
    Sidewalk Shed · installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 4, 2026
    Permit
    Supported Scaffold · installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 4, 2026
    Permit
    Sidewalk Shed · installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 10, 2026
    Permit
    Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND FACADE REPAIRS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 7, 2026
    Permit
    Sign · SIGN TAG AS NON-ILLUMINATED F.C.O. LETTER SIGN 1 @ CLAREMONT AVE FACADE ELEVATION- IDENTIFYING THE NAME OF THE BUILDING AS THE ROY AND DIANA VAGELOS SCIENCE CENTER
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 1, 2026
    Permit
    General Construction · Application filed for partiallt removed masonry, wall base for new door opening, remove flooring, ceiling light fixtures . Installation of new luxury vinyl, door and frames. No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 1, 2026
    Permit
    Plumbing · Plumbing application filed for reomval of plumbing fixtures, cuting and patching. No change to use, egress and occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 24, 2026
    Permit
    Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 28, 2026
    Permit
    Supported Scaffold · Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 20, 2026
    Permit
    Boiler Equipment · REPLACEMENT (1) NEW 330 GALLON TEMPORARY OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 20, 2026
    Permit
    Boiler Equipment · INTALLATION OF FUEL OIL STORAGE TANKS SERVING NEW EMERGENCY GENERATOR FILING IN CONJUNCTION TO ALT CO #M00898377. FUEL OIL STORAGE TANKS ARE LOCATED IN THE CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 27, 2026
    Permit
    General Construction · Minor Alterations of Existing Diana Center to accommodate proposed adjacent RDSC Building Construction under ALT CO Application M00898377-I1. No changes in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 20, 2026
    Permit
    Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 20, 2026
    Permit
    Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 19, 2026
    Permit
    Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)