Standpipe · Temporary dry standpipe system, including 6 riser, 2 hose valves at each floor, Siamese connection, pressure gauges, and air-release valve. Install air compressor with supervisory switches and alarm components to maintain pressurization
Standpipe · Temporary dry standpipe system, including 6 riser, 2 hose valves at each floor, Siamese connection, pressure gauges, and air-release valve. Install air compressor with supervisory switches and alarm components to maintain pressurization
No product keyword matched · NYC DOB building permits
Standpipe · Installation of a temporary dry standpipe system for construction in accordance with BC 3303, BC 3311, and NFPA 14. Work includes installation of temporary 4 dry standpipe riser(s), hose valves at required intermediate floors, Siamese fire department con
No product keyword matched · NYC DOB building permits
Supported Scaffold · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Supported Scaffold · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Construction Fence · INSTALLATION OF CONSTRUCTION FENCE FOR NEW BUILDING CONSTRUCTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Construction Fence · INSTALLATION OF TEMPORARY CONST. PLYWOOD FENCE AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. SW SHED AND PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF 7,100 LB DUAL CAR PERSONNEL/MATERIAL HOIST AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
General Construction · MPP#507: INTERIOR DEMOLITION OF TENATNT FITOUTS THAT NO LONGER OCCUPY THE BUILDINGAT FLOORS 3 & 14. NO REMOVAL OF BASE BUILDING SYSTESM ,S TRUCTURE, OREXTERIOR ENVELOPE ALL LIFE SAFETY SYSTEMS TO BE MAINTANED PER CODE. No
No product keyword matched · NYC DOB building permits
General Construction · HEREWITH FILING FOR APARTMENT RENOVATION. MODIFICATION OF INTERIOR PARTITION, DOOR AND CEILING AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
No product keyword matched · NYC DOB building permits
Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AND SYSTEM STAIR SCAFFOLD AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF TEMPORARY ROOF PROTECTION OVER ADJACENT PROPERTIES, AND ENGINEERING ENCLOSURE SYSTEM AS PER PLANS. PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO
No product keyword matched · NYC DOB building permits