Sprinklers · New and replaced plumbing fixtures. Relocation of existing storm piping. New sprinkler heads. 4 new first hose cabinets. No change to use,egress, or occupancy.
No product keyword matched · NYC DOB building permits
Plumbing · New and replaced plumbing fixtures. Relocation of existing storm piping. New sprinkler heads. 4 new first hose cabinets. No change to use,egress, or occupancy.
No product keyword matched · NYC DOB building permits
Standpipe · New and replaced plumbing fixtures. Relocation of existing storm piping. New sprinkler heads. 4 new first hose cabinets. No change to use,egress, or occupancy.
No product keyword matched · NYC DOB building permits
Sprinklers · Replaced and new plumbing fixtures, removal of temp heads, addition of new sprinkler heads and preaction, and new fire hose cabinets. No change to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Minor demolition with installation of new partitions on the 5th Floor (Leerink) as per plans. No change to Use, Egress or Occupancy.
No product keyword matched · NYC DOB building permits
Sprinklers · Replaced and new plumbing fixtures, removal of temp heads, addition of new sprinkler heads and preaction, and new fire hose cabinets. No change to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
Sprinklers · Removal of existing sprinkler system with installation of temporary heads on the 22nd floor (Suite Demo) as per plans. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Structural · REMOVAL OF TRAVERTINE VENEER. REMOVAL AND REPLACEMENT OF MASONRY BACKUP WALL AT 2ND THROUGH 5TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Plumbing · Existing sprinkler heads in lobby area to be replaced and relocated. New sprinkler heads added in lobby expansion. Plumbing work to include outdoor canopy upgrade & storm drainage.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Modifications to the existing HVAC system on the 1st and mezzanine floors (LL Work) as per plans. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Minor demolition with installation of new partitions on the 32nd Floor (McKool Smith) as per plans. No change to Use, Egress or Occupancy.
No product keyword matched · NYC DOB building permits