Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/AERIAL DESIGN BUILD SVCS
Back to prospects

AERIAL DESIGN BUILD SVCS

Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
AERIAL DESIGN BUILD SVCS
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 22, 2026
Source for Signal date (opens in new tab)
Signal count
11 saved signals, 6 in the last 90 days
Signal summary
Mechanical Systems · PROVIDE NEW VARIABLE refrigerant flow heat pumps for space coolong and heating and associated ductwrk and controls. Provide new steam radiators for space heating.
Source for Signal summary (opens in new tab)
Address
122 E 57TH STREET ROOM 4R
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

11 signals
  • Oct 22, 2026
    Permit
    Mechanical Systems · PROVIDE NEW VARIABLE refrigerant flow heat pumps for space coolong and heating and associated ductwrk and controls. Provide new steam radiators for space heating.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Mechanical Systems · HVAC UNITS AND DRYER EXHAUST INSTALLATION FOR APT 2BCD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 2, 2026
    Permit
    General Construction · RENOVATION OF APT 4S ON 4TH FLOOR TO INCLUDEREMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, DOORS, FINISHES, ANDMODIFICATION OF PLUMBING FIXTURES AS PER PLANS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    Structural · THE STRUCTURAL SCOPE OF WORK INCLUDES ADDITION OF NEW STEEL BEAMS AND POSTS TO ACCOMMODATE THE ENLARGED OPENING AT THE FIRST FLOOR,DESIGN OF THE STAIR STRINGERS, AND INFILL OF AN EXISTING OPENING AT THE FIRST FLOOR
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 19, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF EXISTING RESTAURANT SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 17, 2026
    Permit
    Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEMS, INCLUDING TYPE 1 HOOD AND KITCHEN EXHAUST AT FIRST FLOOR, AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 14, 2026
    Permit
    General Construction · Alteration per plans. No change of use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    Mechanical Systems · Mechanical work filed in conjunction with the renovation of an existing dwelling unit as per plans. No change of use, occupancy or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    General Construction · Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 19, 2026
    Permit
    General Construction · PROPOSED TO CONVERT EXISTING (2) TWO FAMILY TO (1) ONE FAMILY, VERTICAL ENLARGEMENT FROM 3 STORY TO 4 STORY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 18, 2026
    Permit
    General Construction · HEREWITH FILING FOR INTERIOR ARCHITECTURAL RENOVATIONS ON THE 5TH FLR - APT 5A UNIT PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)