Mechanical Systems · Removal of existing 100 tons package unit and installation of new (5) 20 tons water source heat recovery systems to connect to (25) 4-way cassettes in the existing physical culture establishment.
Mechanical Systems · Removal of existing 100 tons package unit and installation of new (5) 20 tons water source heat recovery systems to connect to (25) 4-way cassettes in the existing physical culture establishment.
No product keyword matched · NYC DOB building permits
General Construction · PROPOSED CHANGE OF USE OF EXISTING OF EXISTING OFFICE SPACE (UG6) ON THE CELLAR FLOOR TO ADULT EDUCATION UG: VI. MINOR PARTITION WORK TO BE DONE.
No product keyword matched · NYC DOB building permits